ITAC Assessment: IA0488
ITAC logo
ITAC Assessment: IA0488
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product plastic foodservice items
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 60
Plant Area 60,000
ft2
Annual Production 6,500,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) Minnesota

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $315,766 5,569,581
kWh
Electricity Demand $130,124 14,718
kW-mo/yr
Electricity Fees $48,801 -
Natural Gas $13,396 2,534
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $20,805 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,180 $550 $2,431
42,900
kWh
$749
-
kW-mo/yr
02 2.4231: Reduce the pressure of compressed air to the minimum required $758 $105 $578
10,200
kWh
$180
-
kW-mo/yr
03 2.4221: Install compressor air intakes in coolest locations $1,714 $800 $1,339
23,567
kWh
$375
-
kW-mo/yr
04 2.4239: Eliminate or reduce compressed air usage $709 $250 $541
9,540
kWh
$168
-
kW-mo/yr
05 2.6218: Turn off equipment when not in use $610 $550 $507
8,935
kWh
$103
-
kW-mo/yr
06 2.7135: Install occupancy sensors $3,689 $4,074 $3,689
65,056
kWh
-
07 2.7111: Reduce illumination to minimum necessary levels $1,208 $554 $881
15,542
kWh
$327
-
kW-mo/yr
08 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,279 $7,090 $3,529
62,235
kWh
$750
-
kW-mo/yr
09 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,676 $7,150 $1,140
20,103
kWh
$536
-
kW-mo/yr
10 2.7229: Air condition only space necessary $1,073 $70 $1,073
18,920
kWh
-
11 2.4133: Use most efficient type of electric motors $1,909 $743 $1,457
25,704
kWh
$452
-
kW-mo/yr
TOTAL RECOMMENDED $20,805 $21,936 $17,165
302,702
kWh
$3,640
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs