ITAC Assessment: IA0478
ITAC logo
ITAC Assessment: IA0478
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product paper packaging
NAICS 322121: Paper (except Newsprint) Mills
SIC 2621: Paper Mills
Sales Range $10
M
to 50
M
# of Employees 85
Plant Area 65,000
ft2
Annual Production 1,000
ton
Production Hrs. Annual 6,240
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $79,541 2,254,700
kWh
Electricity Demand $74,280 5,139
kW-mo/yr
Electricity Fees $2,288 -
Natural Gas $73,725 12,118
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $30,020 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4239: Eliminate or reduce compressed air usage $12,154 $9,240 $6,853
194,688
kWh
$5,301
-
kW-mo/yr
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,014 $238 $655
18,572
kWh
$359
-
kW-mo/yr
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $7,168 $10,706 $4,042
114,816
kWh
$3,126
-
kW-mo/yr
-
04 2.4239: Eliminate or reduce compressed air usage $1,246 $164 $698
19,824
kWh
$548
-
kW-mo/yr
-
05 2.7135: Install occupancy sensors $1,757 $5,400 $1,757
49,920
kWh
- -
06 2.2437: Recover waste heat from equipment $1,452 $500 - - $1,452
-
MMBtu
07 2.6218: Turn off equipment when not in use $1,043 $25 $668
18,980
kWh
$375
-
kW-mo/yr
-
08 2.4221: Install compressor air intakes in coolest locations $3,521 $540 $1,960
55,695
kWh
$1,561
-
kW-mo/yr
-
09 2.4231: Reduce the pressure of compressed air to the minimum required $665 $50 $359
10,216
kWh
$306
-
kW-mo/yr
-
TOTAL RECOMMENDED $30,020 $26,863 $16,992
482,711
kWh
$11,576
-
kW-mo/yr
$1,452
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs