Assessment Year | 2012 |
---|---|
Principal Product | Ball Bearings |
NAICS | 332991: Ball and Roller Bearing Manufacturing |
SIC | 3562: Ball and Roller Bearings |
Sales Range | $10 M to 50M |
# of Employees | 66 |
Plant Area |
90,200
ft2
|
Annual Production | 5,793,748
lb
|
Production Hrs. Annual | 8,568
hrs
|
Location (State) | Iowa |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $218,488 | 7,093,800 |
kWh
|
$0.031 |
Electricity Demand | $80,276 | 13,723 |
kW-mo/yr
|
$5.85 |
Electricity Fees | $1,995 | - |
|
- |
Natural Gas | $53,346 | 6,614 |
MMBtu
|
$8.07 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $11,357 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $1,361 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $4,431 | $17,319 |
$3,173
103,014
kWh
|
$1,258
-
kW-mo/yr
|
- | |
02 | 2.7135: Install occupancy sensors | $1,471 | $2,422 |
$1,471
47,796
kWh
|
- | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,805 | $2,292 |
$1,191
38,644
kWh
|
$614
-
kW-mo/yr
|
- | |
04 | 2.4221: Install compressor air intakes in coolest locations | $1,361 | $918 |
$1,082
35,068
kWh
|
$279
-
kW-mo/yr
|
- | |
05 | 2.2443: Re-use or recycle hot or cold process exhaust air | $1,225 | $979 |
$353
11,447
kWh
|
- |
$872
-
MMBtu
|
|
06 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,064 | $3,948 |
$778
25,218
kWh
|
$286
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $11,357 | $27,878 |
$8,048
261,187
kWh
|
$2,437
-
kW-mo/yr
|
$872
-
MMBtu
|
||
TOTAL IMPLEMENTED | $1,361 | $918 |
$1,082
35,068
kWh
|
$279
-
kW-mo/yr
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs