Assessment Year | 2012 |
---|---|
Principal Product | hydraulic motors and steering units |
NAICS | 336330: Motor Vehicle Steering and Suspension Components (except Spring) Manufacturing |
SIC | 3714: Motor Vehicle Parts and Accessories |
Sales Range | $50 M to 100M |
# of Employees | 244 |
Plant Area |
233,000
ft2
|
Annual Production | 500,000
pieces
|
Production Hrs. Annual | 7,200
hrs
|
Location (State) | Minnesota |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $800,491 | 16,360,376 |
kWh
|
$0.049 |
Electricity Demand | $271,794 | 33,366 |
kW-mo/yr
|
$8.15 |
Electricity Fees | $103,252 | - |
|
- |
Natural Gas | $79,030 | 13,857 |
MMBtu
|
$5.70 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $20,331 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $3,392 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.7135: Install occupancy sensors | $1,055 | $1,160 |
$1,055
21,583
kWh
|
- | - | |
02 | 2.7144: Install spectral reflectors / delamp | $1,377 | $235 |
$997
20,390
kWh
|
$380
-
kW-mo/yr
|
- | |
03 | 2.6218: Turn off equipment when not in use | $3,726 | $240 |
$3,726
76,200
kWh
|
- | - | |
04 | 2.2136: Install / repair insulation on steam lines | $1,097 | $1,375 | - | - |
$1,097
-
MMBtu
|
|
05 | 2.4239: Eliminate or reduce compressed air usage | $960 | $433 |
$960
19,200
kWh
|
- | - | |
06 | 2.2437: Recover waste heat from equipment | $2,229 | $16,000 | - | - |
$2,229
-
MMBtu
|
|
07 | 2.4221: Install compressor air intakes in coolest locations | $3,517 | $550 |
$2,641
53,879
kWh
|
$876
-
kW-mo/yr
|
- | |
08 | 2.2437: Recover waste heat from equipment | $4,902 | $4,500 | - | - |
$4,902
-
MMBtu
|
|
09 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,468 | $160 |
$1,160
23,731
kWh
|
$308
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $20,331 | $24,653 |
$10,539
214,983
kWh
|
$1,564
-
kW-mo/yr
|
$8,228
-
MMBtu
|
||
TOTAL IMPLEMENTED | $3,392 | $1,828 |
$3,012
61,173
kWh
|
$380
-
kW-mo/yr
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs