ITAC Assessment: IA0467
ITAC logo
ITAC Assessment: IA0467
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product Advertising promotional products
NAICS 323111: Commercial Printing (except Screen and Books)
SIC 2759: Commercial Printing, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 750
Plant Area 175,000
ft2
Annual Production 10,000,000
units
Production Hrs. Annual 7,488
hrs
Location (State) Minnesota

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $114,826 5,003,296
kWh
Electricity Demand $49,943 11,325
kW-mo/yr
Natural Gas $21,656 3,924
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $8,038 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,748

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,650 $500 $1,414
61,628
kWh
$436
-
kW-mo/yr
- $(-200.0)
02 2.4221: Install compressor air intakes in coolest locations $1,322 $500 $994
43,022
kWh
$328
-
kW-mo/yr
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $225 $728 $172
7,487
kWh
$53
-
kW-mo/yr
- -
04 2.7135: Install occupancy sensors $1,873 $5,024 $1,873
81,592
kWh
- - -
05 2.2515: Use optimum thickness insulation $2,968 $3,893 $2,653
115,358
kWh
- $315
-
MMBtu
-
TOTAL RECOMMENDED $8,038 $10,645 $7,106
309,087
kWh
$817
-
kW-mo/yr
$315
-
MMBtu
$(-200.0)
TOTAL IMPLEMENTED $3,748 $6,252 $3,459
150,707
kWh
$489
-
kW-mo/yr
- $(-200.0)
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs