Assessment Year | 2011 |
---|---|
Principal Product | Advertising promotional products |
NAICS | 323111: Commercial Printing (except Screen and Books) |
SIC | 2759: Commercial Printing, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 750 |
Plant Area |
175,000
ft2
|
Annual Production | 10,000,000
units
|
Production Hrs. Annual | 7,488
hrs
|
Location (State) | Minnesota |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $114,826 | 5,003,296 |
kWh
|
$0.023 |
Electricity Demand | $49,943 | 11,325 |
kW-mo/yr
|
$4.41 |
Natural Gas | $21,656 | 3,924 |
MMBtu
|
$5.52 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $8,038 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $3,748 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,650 | $500 |
$1,414
61,628
kWh
|
$436
-
kW-mo/yr
|
- | $(-200.0) | |
02 | 2.4221: Install compressor air intakes in coolest locations | $1,322 | $500 |
$994
43,022
kWh
|
$328
-
kW-mo/yr
|
- | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $225 | $728 |
$172
7,487
kWh
|
$53
-
kW-mo/yr
|
- | - | |
04 | 2.7135: Install occupancy sensors | $1,873 | $5,024 |
$1,873
81,592
kWh
|
- | - | - | |
05 | 2.2515: Use optimum thickness insulation | $2,968 | $3,893 |
$2,653
115,358
kWh
|
- |
$315
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $8,038 | $10,645 |
$7,106
309,087
kWh
|
$817
-
kW-mo/yr
|
$315
-
MMBtu
|
$(-200.0) | ||
TOTAL IMPLEMENTED | $3,748 | $6,252 |
$3,459
150,707
kWh
|
$489
-
kW-mo/yr
|
- | $(-200.0) |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs