ITAC Assessment: IA0464
ITAC logo
ITAC Assessment: IA0464
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product Hand winches, trailer tongue jacks, and couplers
NAICS 332813: Electroplating, Plating, Polishing, Anodizing, and Coloring
SIC 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring
Sales Range $10
M
to 50
M
# of Employees 180
Plant Area 185,786
ft2
Annual Production 1,017,756
pieces
Production Hrs. Annual 5,329
hrs
Location (State) Nebraska

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $131,699 2,359,560
kWh
Electricity Demand $49,932 6,972
kW-mo/yr
Natural Gas $46,050 8,105
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $25,142 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $25,142

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.2135: Repair and eliminate steam leaks $1,766 $700 $1,007
18,010
kWh
$759
-
kW-mo/yr
02 2.4221: Install compressor air intakes in coolest locations $387 $290 $219
3,964
kWh
$168
-
kW-mo/yr
03 2.4231: Reduce the pressure of compressed air to the minimum required $380 $15 $217
3,876
kWh
$163
-
kW-mo/yr
04 2.7111: Reduce illumination to minimum necessary levels $1,199 $45 $704
11,750
kWh
$495
-
kW-mo/yr
05 2.7142: Utilize higher efficiency lamps and/or ballasts $6,295 $10,281 $3,696
61,690
kWh
$2,599
-
kW-mo/yr
06 2.7142: Utilize higher efficiency lamps and/or ballasts $12,737 $33,313 $7,477
124,848
kWh
$5,260
-
kW-mo/yr
07 2.7142: Utilize higher efficiency lamps and/or ballasts $2,378 $7,606 $1,396
23,298
kWh
$982
-
kW-mo/yr
TOTAL RECOMMENDED $25,142 $52,250 $14,716
247,436
kWh
$10,426
-
kW-mo/yr
TOTAL IMPLEMENTED $25,142 $52,250 $14,716
247,436
kWh
$10,426
-
kW-mo/yr
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs