Assessment Year | 2011 |
---|---|
Principal Product | Hand winches, trailer tongue jacks, and couplers |
NAICS | 332813: Electroplating, Plating, Polishing, Anodizing, and Coloring |
SIC | 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring |
Sales Range | $10 M to 50M |
# of Employees | 180 |
Plant Area |
185,786
ft2
|
Annual Production | 1,017,756
pieces
|
Production Hrs. Annual | 5,329
hrs
|
Location (State) | Nebraska |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $131,699 | 2,359,560 |
kWh
|
$0.056 |
Electricity Demand | $49,932 | 6,972 |
kW-mo/yr
|
$7.16 |
Natural Gas | $46,050 | 8,105 |
MMBtu
|
$5.68 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $25,142 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $25,142 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
---|---|---|---|---|---|---|
01 | 2.2135: Repair and eliminate steam leaks | $1,766 | $700 |
$1,007
18,010
kWh
|
$759
-
kW-mo/yr
|
|
02 | 2.4221: Install compressor air intakes in coolest locations | $387 | $290 |
$219
3,964
kWh
|
$168
-
kW-mo/yr
|
|
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $380 | $15 |
$217
3,876
kWh
|
$163
-
kW-mo/yr
|
|
04 | 2.7111: Reduce illumination to minimum necessary levels | $1,199 | $45 |
$704
11,750
kWh
|
$495
-
kW-mo/yr
|
|
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,295 | $10,281 |
$3,696
61,690
kWh
|
$2,599
-
kW-mo/yr
|
|
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $12,737 | $33,313 |
$7,477
124,848
kWh
|
$5,260
-
kW-mo/yr
|
|
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,378 | $7,606 |
$1,396
23,298
kWh
|
$982
-
kW-mo/yr
|
|
TOTAL RECOMMENDED | $25,142 | $52,250 |
$14,716
247,436
kWh
|
$10,426
-
kW-mo/yr
|
||
TOTAL IMPLEMENTED | $25,142 | $52,250 |
$14,716
247,436
kWh
|
$10,426
-
kW-mo/yr
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs