ITAC Assessment: MI0098
ITAC logo
ITAC Assessment: MI0098
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product EPS foam product, Polyisocyanurate (ISO) rigid foam
NAICS 326140: Polystyrene Foam Product Manufacturing
SIC 3086: Plastics Foam Products
Sales Range $10
M
to 50
M
# of Employees 55
Plant Area 60,000
ft2
Annual Production 62,000
thousand feet
Production Hrs. Annual 4,250
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $78,659 1,495,200
kWh
Electricity Demand $41,094 5,156
kW-mo/yr
Electricity Fees $14,635 -
Natural Gas $49,329 4,899
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $41,100 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $38,346

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Water Disposal Savings Ancillary Material Cost Savings Primary Product Savings Increase in Production Savings
01 2.6218: Turn off equipment when not in use $24,731 $1,000 $24,731
416,577
kWh
- - - - -
02 4.131: Modify process to reduce material use/cost $7,463 $111 - - - - $7,462 $1
03 4.611: Begin a practice of predictive / preventative maintenance $4,950 $1,910 - - - $4,950 - -
04 3.4116: Meter recycled water (to reduce sewer charges) $2,754 $4,360 - - $2,754
-
Tgal
- - -
05 2.2135: Repair and eliminate steam leaks $901 $380 - $901
-
MMBtu
- - - -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $301 $400 $301
5,705
kWh
- - - - -
TOTAL RECOMMENDED $41,100 $8,161 $25,032
422,282
kWh
$901
-
MMBtu
$2,754
-
Tgal
$4,950 $7,462 $1
TOTAL IMPLEMENTED $38,346 $3,801 $25,032
422,282
kWh
$901
-
MMBtu
- $4,950 $7,462 $1
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Water Disposal Savings Ancillary Material Cost Savings Primary Product Savings Increase in Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs