ITAC Assessment: IA0460
ITAC logo
ITAC Assessment: IA0460
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product Pellet Die and Hammer Mills
NAICS 333120: Construction Machinery Manufacturing
SIC 3531: Construction Machinery and Equipment
Sales Range less than $500
k
# of Employees 81
Plant Area 120,000
ft2
Annual Production 1
units
Production Hrs. Annual 6,240
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $181,575 3,624,252
kWh
Electricity Demand $3,236 628
kW-mo/yr
Natural Gas $24,037 2,916
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $12,081 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,581

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,522 $4,244 $2,047
40,768
kWh
$475
-
kW-mo/yr
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $5,099 $7,498 $4,260
84,864
kWh
$839
-
kW-mo/yr
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $802 $1,695 $575
11,457
kWh
$227
-
kW-mo/yr
-
04 2.7135: Install occupancy sensors $282 $200 $282
5,624
kWh
- -
05 2.4221: Install compressor air intakes in coolest locations $195 $200 $147
2,926
kWh
$48
-
kW-mo/yr
-
06 2.4221: Install compressor air intakes in coolest locations $333 $200 $285
5,684
kWh
$48
-
kW-mo/yr
-
07 2.4231: Reduce the pressure of compressed air to the minimum required $367 $50 $281
5,600
kWh
$86
-
kW-mo/yr
-
08 2.4231: Reduce the pressure of compressed air to the minimum required $575 $50 $495
9,780
kWh
$80
-
kW-mo/yr
-
09 2.4133: Use most efficient type of electric motors $1,176 $3,670 $1,019
20,305
kWh
$157
-
kW-mo/yr
-
10 2.2437: Recover waste heat from equipment $730 $200 - - $730
-
MMBtu
TOTAL RECOMMENDED $12,081 $18,007 $9,391
187,008
kWh
$1,960
-
kW-mo/yr
$730
-
MMBtu
TOTAL IMPLEMENTED $10,581 $17,557 $8,749
174,302
kWh
$1,832
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs