ITAC Assessment: IA0458
ITAC logo
ITAC Assessment: IA0458
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product Automotive Battery Grids
NAICS 335911: Storage Battery Manufacturing
SIC 3691: Storage Batteries
Sales Range less than $500
k
# of Employees 55
Plant Area 90,000
ft2
Annual Production 85,000,000
lb
Production Hrs. Annual 8,400
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $363,297 12,531,930
kWh
Electricity Demand $118,029 19,848
kW-mo/yr
Electricity Fees $21,612 -
Natural Gas $654,490 91,471
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $89,008 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $84,230

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,473 $1,020 $1,140
39,312
kWh
$333
-
kW-mo/yr
-
02 2.7135: Install occupancy sensors $1,769 $2,181 $1,769
61,010
kWh
- -
03 2.7231: Use radiant heater for spot heating $48,853 $11,000 - - $48,853
-
MMBtu
04 2.4133: Use most efficient type of electric motors $3,520 $2,139 $2,714
93,592
kWh
$806
-
kW-mo/yr
-
05 2.2437: Recover waste heat from equipment $4,683 $2,050 - - $4,683
-
MMBtu
06 2.4231: Reduce the pressure of compressed air to the minimum required $1,258 $25 $794
27,384
kWh
$464
-
kW-mo/yr
-
07 2.4221: Install compressor air intakes in coolest locations $816 $500 $518
17,842
kWh
$298
-
kW-mo/yr
-
08 2.2628: Utilize a less expensive cooling method $26,636 $22,000 $26,636
918,500
kWh
- -
TOTAL RECOMMENDED $89,008 $40,915 $33,571
1,157,640
kWh
$1,901
-
kW-mo/yr
$53,536
-
MMBtu
TOTAL IMPLEMENTED $84,230 $38,751 $30,063
1,036,664
kWh
$631
-
kW-mo/yr
$53,536
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs