ITAC Assessment: IA0454
ITAC logo
ITAC Assessment: IA0454
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product Electronic Display Systems
NAICS 334419: Other Electronic Component Manufacturing
SIC 3993: Signs and Advertising Specialties
Sales Range greater than $500
M
# of Employees 2,400
Plant Area 740,000
ft2
Annual Production 200,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) South Dakota

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $510,863 15,374,116
kWh
Electricity Demand $367,930 33,444
kW-mo/yr
Electricity Fees $52,729 -
Natural Gas $47,691 6,029
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $11,188 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,607

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,680 $5,214 $1,637
49,296
kWh
$1,043
-
kW-mo/yr
-
02 2.7135: Install occupancy sensors $1,365 $1,560 $1,365
41,124
kWh
- -
03 2.4231: Reduce the pressure of compressed air to the minimum required $1,363 $20 $829
24,960
kWh
$534
-
kW-mo/yr
-
04 2.4231: Reduce the pressure of compressed air to the minimum required $218 $20 $86
2,600
kWh
$132
-
kW-mo/yr
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,229 $300 $1,972
59,405
kWh
$1,257
-
kW-mo/yr
-
06 2.2437: Recover waste heat from equipment $980 $400 - - $980
-
MMBtu
07 2.4221: Install compressor air intakes in coolest locations $1,152 $300 $713
21,481
kWh
$439
-
kW-mo/yr
-
08 2.4221: Install compressor air intakes in coolest locations $201 $150 $74
2,281
kWh
$127
-
kW-mo/yr
-
TOTAL RECOMMENDED $11,188 $7,964 $6,676
201,147
kWh
$3,532
-
kW-mo/yr
$980
-
MMBtu
TOTAL IMPLEMENTED $9,607 $7,924 $5,761
173,587
kWh
$2,866
-
kW-mo/yr
$980
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs