Assessment Year | 2009 |
---|---|
Principal Product | navigation products |
NAICS | 334511: Search, Detection, Navigation, Guidance, Aeronautical, and Nautical System and Instrument Manufactur |
SIC | 3812: Search, Detection, Navigation, Guidance, Aeronautical, and Nautical Systems and Instruments |
Sales Range | $100 M to 500M |
# of Employees | 900 |
Plant Area |
238,000
ft2
|
Annual Production | 25,000
pieces
|
Production Hrs. Annual | 2,210
hrs
|
Location (State) | Minnesota |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $643,271 | 16,621,056 |
kWh
|
$0.039 |
Electricity Demand | $152,165 | 40,824 |
kW-mo/yr
|
$3.73 |
Natural Gas | $272,630 | 29,366 |
MMBtu
|
$9.28 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $65,772 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.4221: Install compressor air intakes in coolest locations | $301 | $25 |
$239
6,188
kWh
|
$62
-
kW-mo/yr
|
- | |
02 | 3.6126: Direct waste gasses to boiler combustion air | $2,004 | $500 | - | - |
$2,004
-
MMBtu
|
|
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $16,271 | $27,700 |
$12,898
334,152
kWh
|
$3,373
-
kW-mo/yr
|
- | |
04 | 2.7111: Reduce illumination to minimum necessary levels | $4,852 | $7,025 |
$4,852
125,693
kWh
|
- | - | |
05 | 2.7135: Install occupancy sensors | $686 | $960 |
$686
17,787
kWh
|
- | - | |
06 | 2.7224: Reduce space conditioning during non-working hours | $8,087 | $6,000 | - | - |
$8,087
-
MMBtu
|
|
07 | 2.7314: Reduce ventilation air | $27,399 | $12,400 |
$1,933
50,066
kWh
|
- |
$25,466
-
MMBtu
|
|
08 | 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary | $6,172 | $2,600 |
$5,452
141,255
kWh
|
$720
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $65,772 | $57,210 |
$26,060
675,141
kWh
|
$4,155
-
kW-mo/yr
|
$35,557
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs