Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product Monolithic, insulated and fabricated glass
NAICS 327215: Glass Product Manufacturing Made of Purchased Glass
SIC 3231: Glass Products, Made of Purchased Glass
Sales Range $10
M
to 50
M
# of Employees 50
Plant Area 105,000
ft2
Annual Production 10,000
thousand feet
Production Hrs. Annual 6,240
hrs
Location (State) Minnesota

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $334,485 6,622,007
kWh
Electricity Demand $109,226 21,900
kW-mo/yr
Natural Gas $7,610 621
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $46,591 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,700

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4221: Install compressor air intakes in coolest locations $9,332 $252 $7,862
155,302
kWh
$1,470
-
kW-mo/yr
02 2.4231: Reduce the pressure of compressed air to the minimum required $7,663 $45 $6,441
127,296
kWh
$1,222
-
kW-mo/yr
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $978 $240 $821
16,223
kWh
$157
-
kW-mo/yr
04 2.2514: Cover open tanks $881 $225 $881
17,410
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $22,079 $36,423 $18,559
366,789
kWh
$3,520
-
kW-mo/yr
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,172 $1,917 $908
17,924
kWh
$264
-
kW-mo/yr
07 2.7135: Install occupancy sensors $552 $1,309 $552
10,875
kWh
-
08 2.4133: Use most efficient type of electric motors $2,096 $317 $1,762
34,818
kWh
$334
-
kW-mo/yr
09 2.6212: Turn off equipment during breaks, reduce operating time $1,838 $15 $1,838
36,317
kWh
-
TOTAL RECOMMENDED $46,591 $40,743 $39,624
782,954
kWh
$6,967
-
kW-mo/yr
TOTAL IMPLEMENTED $12,700 $1,816 $11,073
218,717
kWh
$1,627
-
kW-mo/yr
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs