| Assessment Year | 2008 |
|---|---|
| Principal Product | Hydraulic Cylinders |
| NAICS | 333995: Fluid Power Cylinder and Actuator Manufacturing |
| SIC | 3593: Fluid Power Cylinders and Actuators |
| Sales Range | $10 M to 50M |
| # of Employees | 115 |
| Plant Area |
66,349
ft2
|
| Annual Production | 100,000
pieces
|
| Production Hrs. Annual | 5,200
hrs
|
| Location (State) | Iowa |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $72,318 | 2,020,032 |
kWh
|
$0.036 |
| Electricity Demand | $29,348 | 5,868 |
kW-mo/yr
|
$5.00 |
| Electricity Fees | $9,010 | - |
|
- |
| Natural Gas | $107,531 | 9,768 |
MMBtu
|
$11.01 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $22,023 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $20,316 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4221: Install compressor air intakes in coolest locations | $723 | $346 |
$546
15,271
kWh
|
$177
-
kW-mo/yr
|
- | |
| 02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $640 | $12 |
$484
13,520
kWh
|
$156
-
kW-mo/yr
|
- | |
| 03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,028 | $1,014 |
$1,539
43,003
kWh
|
$489
-
kW-mo/yr
|
- | |
| 04 | 2.4239: Eliminate or reduce compressed air usage | $1,300 | $1,300 |
$1,300
36,309
kWh
|
- | - | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $14,425 | $31,431 |
$10,909
304,720
kWh
|
$3,516
-
kW-mo/yr
|
- | |
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,840 | $4,141 |
$1,346
37,625
kWh
|
$494
-
kW-mo/yr
|
- | |
| 07 | 2.1131: Repair faulty insulation in furnaces, boilers, etc | $1,067 | $1,096 | - | - |
$1,067
-
MMBtu
|
|
| TOTAL RECOMMENDED | $22,023 | $39,340 |
$16,124
450,448
kWh
|
$4,832
-
kW-mo/yr
|
$1,067
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $20,316 | $38,232 |
$15,640
436,928
kWh
|
$4,676
-
kW-mo/yr
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs