ITAC Assessment: IA0425
ITAC logo
ITAC Assessment: IA0425
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product Cotton harvesters
NAICS 333111: Farm Machinery and Equipment Manufacturing
SIC 3523: Farm Machinery and Equipment
Sales Range greater than $500
M
# of Employees 1,166
Plant Area 586,577
ft2
Annual Production 70,442
ton
Production Hrs. Annual 6,000
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,209,591 52,887,135
kWh
Natural Gas $3,836,525 410,364
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $80,342 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $73,970

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.2135: Repair and eliminate steam leaks $1,843 $600 - - $1,843
-
MMBtu
02 2.2136: Install / repair insulation on steam lines $1,124 $640 - - $1,124
-
MMBtu
03 2.7261: Install timers and/or thermostats $15,476 $600 - - $15,476
-
MMBtu
04 2.7232: Replace existing hvac unit with high efficiency model $50,635 $291,629 - - $50,635
-
MMBtu
05 2.4226: Use / purchase optimum sized compressor $3,405 $6,450 $3,405
186,384
kWh
- -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $7,859 $2,000 $5,442
297,840
kWh
$2,417
-
kW-mo/yr
-
TOTAL RECOMMENDED $80,342 $301,919 $8,847
484,224
kWh
$2,417
-
kW-mo/yr
$69,078
-
MMBtu
TOTAL IMPLEMENTED $73,970 $294,229 $5,442
297,840
kWh
$2,417
-
kW-mo/yr
$66,111
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs