| Assessment Year | 2008 |
|---|---|
| Principal Product | Cotton harvesters |
| NAICS | 333111: Farm Machinery and Equipment Manufacturing |
| SIC | 3523: Farm Machinery and Equipment |
| Sales Range | greater than $500 M |
| # of Employees | 1,166 |
| Plant Area |
586,577
ft2
|
| Annual Production | 70,442
ton
|
| Production Hrs. Annual | 6,000
hrs
|
| Location (State) | Iowa |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $2,209,591 | 52,887,135 |
kWh
|
$0.042 |
| Natural Gas | $3,836,525 | 410,364 |
MMBtu
|
$9.35 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $80,342 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $73,970 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.2135: Repair and eliminate steam leaks | $1,843 | $600 | - | - |
$1,843
-
MMBtu
|
|
| 02 | 2.2136: Install / repair insulation on steam lines | $1,124 | $640 | - | - |
$1,124
-
MMBtu
|
|
| 03 | 2.7261: Install timers and/or thermostats | $15,476 | $600 | - | - |
$15,476
-
MMBtu
|
|
| 04 | 2.7232: Replace existing hvac unit with high efficiency model | $50,635 | $291,629 | - | - |
$50,635
-
MMBtu
|
|
| 05 | 2.4226: Use / purchase optimum sized compressor | $3,405 | $6,450 |
$3,405
186,384
kWh
|
- | - | |
| 06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $7,859 | $2,000 |
$5,442
297,840
kWh
|
$2,417
-
kW-mo/yr
|
- | |
| TOTAL RECOMMENDED | $80,342 | $301,919 |
$8,847
484,224
kWh
|
$2,417
-
kW-mo/yr
|
$69,078
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $73,970 | $294,229 |
$5,442
297,840
kWh
|
$2,417
-
kW-mo/yr
|
$66,111
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs