Assessment Year | 2008 |
---|---|
Principal Product | Cotton harvesters |
NAICS | 333111: Farm Machinery and Equipment Manufacturing |
SIC | 3523: Farm Machinery and Equipment |
Sales Range | greater than $500 M |
# of Employees | 1,166 |
Plant Area |
586,577
ft2
|
Annual Production | 70,442
ton
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Iowa |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $2,209,591 | 52,887,135 |
kWh
|
$0.042 |
Natural Gas | $3,836,525 | 410,364 |
MMBtu
|
$9.35 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $80,342 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $73,970 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.2135: Repair and eliminate steam leaks | $1,843 | $600 | - | - |
$1,843
-
MMBtu
|
|
02 | 2.2136: Install / repair insulation on steam lines | $1,124 | $640 | - | - |
$1,124
-
MMBtu
|
|
03 | 2.7261: Install timers and/or thermostats | $15,476 | $600 | - | - |
$15,476
-
MMBtu
|
|
04 | 2.7232: Replace existing hvac unit with high efficiency model | $50,635 | $291,629 | - | - |
$50,635
-
MMBtu
|
|
05 | 2.4226: Use / purchase optimum sized compressor | $3,405 | $6,450 |
$3,405
186,384
kWh
|
- | - | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $7,859 | $2,000 |
$5,442
297,840
kWh
|
$2,417
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $80,342 | $301,919 |
$8,847
484,224
kWh
|
$2,417
-
kW-mo/yr
|
$69,078
-
MMBtu
|
||
TOTAL IMPLEMENTED | $73,970 | $294,229 |
$5,442
297,840
kWh
|
$2,417
-
kW-mo/yr
|
$66,111
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs