ITAC Assessment: IA0414
ITAC logo
ITAC Assessment: IA0414
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product Carbonated Soft Drinks
NAICS 312111: Soft Drink Manufacturing
SIC 2086: Bottled and Canned Soft Drinks and Carbonated Waters
Sales Range $10
M
to 50
M
# of Employees 500
Plant Area 250,000
ft2
Annual Production 25,000,000
units
Production Hrs. Annual 6,240
hrs
Location (State) Minnesota

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $427,114 9,038,600
kWh
Electricity Demand $163,951 1,774
kW-mo/yr
Natural Gas $483,975 58,567
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $10,623 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $4,590 $3,793 $3,503
74,069
kWh
$1,087
-
kW-mo/yr
-
02 2.4133: Use most efficient type of electric motors $501 $118 $337
7,118
kWh
$164
-
kW-mo/yr
-
03 2.4221: Install compressor air intakes in coolest locations $807 $262 $626
13,231
kWh
$181
-
kW-mo/yr
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,004 $163 $1,529
32,324
kWh
$475
-
kW-mo/yr
-
05 2.2136: Install / repair insulation on steam lines $2,721 $1,300 - - $2,721
-
MMBtu
TOTAL RECOMMENDED $10,623 $5,636 $5,995
126,742
kWh
$1,907
-
kW-mo/yr
$2,721
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs