ITAC Assessment: IA0413
ITAC logo
ITAC Assessment: IA0413
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product Aluminum and Zinc Castings
NAICS 331523: Nonferrous Metal Die-Casting Foundries
SIC 3363: Aluminum Die-Castings
Sales Range $5
M
to 10
M
# of Employees 54
Plant Area 90,000
ft2
Annual Production 21,000,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) Minnesota

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $65,075 1,402,000
kWh
Electricity Demand $33,167 4,140
kW-mo/yr
Natural Gas $142,708 17,896
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $55,361 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $40,229

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Primary Raw Material Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,287 $500 $1,721
37,250
kWh
$566
-
kW-mo/yr
- -
02 2.4231: Reduce the pressure of compressed air to the minimum required $1,295 $20 $954
20,654
kWh
$341
-
kW-mo/yr
- -
03 2.2437: Recover waste heat from equipment $9,370 $1,650 - - $9,370
-
MMBtu
-
04 2.4221: Install compressor air intakes in coolest locations $1,311 $360 $953
20,707
kWh
$358
-
kW-mo/yr
- -
05 2.4133: Use most efficient type of electric motors $1,793 $104 $1,232
26,719
kWh
$561
-
kW-mo/yr
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $620 $535 $466
10,059
kWh
$154
-
kW-mo/yr
- -
07 2.7135: Install occupancy sensors $350 $390 $350
1,056
kWh
- - -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $1,195 $2,135 $873
18,865
kWh
$322
-
kW-mo/yr
- -
09 2.2437: Recover waste heat from equipment $1,640 $2,160 - - $1,640
-
MMBtu
-
10 2.2514: Cover open tanks $3,772 $1,500 - - $3,772
-
MMBtu
-
11 2.4223: Install direct acting units in place of compressed air pressure system in safety system $677 $80 $358
7,741
kWh
$319
-
kW-mo/yr
- -
12 3.1191: Change procedures / equipment / operating conditions $31,051 $4,000 - - $820
-
MMBtu
$30,231
TOTAL RECOMMENDED $55,361 $13,434 $6,907
143,051
kWh
$2,621
-
kW-mo/yr
$15,602
-
MMBtu
$30,231
TOTAL IMPLEMENTED $40,229 $7,734 $6,557
141,995
kWh
$2,621
-
kW-mo/yr
$820
-
MMBtu
$30,231
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs