Assessment Year | 2007 |
---|---|
Principal Product | Animal Vaccines |
NAICS | 325414: Biological Product (except Diagnostic) Manufacturing |
SIC | 2836: Biological Products, Except Diagnostic Substances |
Sales Range | $50 M to 100M |
# of Employees | 120 |
Plant Area |
153,258
ft2
|
Annual Production | 47,000,000
units
|
Production Hrs. Annual | 2,375
hrs
|
Location (State) | Iowa |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $221,764 | 6,918,528 |
kWh
|
$0.032 |
Electricity Demand | $82,162 | 13,404 |
kW-mo/yr
|
$6.13 |
Electricity Fees | $7,128 | - |
|
- |
Natural Gas | $290,325 | 30,218 |
MMBtu
|
$9.61 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $30,610 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $9,572 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $7,897 | $28,132 |
$3,243
151,471
kWh
|
$4,654
-
kW-mo/yr
|
- | |
02 | 2.7135: Install occupancy sensors | $419 | $1,309 |
$419
19,575
kWh
|
- | - | |
03 | 2.2414: Use waste heat from hot flue gases to preheat | $618 | $1,000 | - | - |
$618
-
MMBtu
|
|
04 | 2.2163: Use minimum steam operating pressure | $833 | $150 | - | - |
$833
-
MMBtu
|
|
05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $911 | $1,275 |
$640
29,908
kWh
|
$271
-
kW-mo/yr
|
- | |
06 | 2.7224: Reduce space conditioning during non-working hours | $17,816 | $1,375 |
$485
22,690
kWh
|
- |
$17,331
-
MMBtu
|
|
07 | 2.4221: Install compressor air intakes in coolest locations | $441 | $410 |
$287
13,395
kWh
|
$154
-
kW-mo/yr
|
- | |
08 | 2.4133: Use most efficient type of electric motors | $1,675 | $33 |
$1,157
54,067
kWh
|
$518
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $30,610 | $33,684 |
$6,231
291,106
kWh
|
$5,597
-
kW-mo/yr
|
$18,782
-
MMBtu
|
||
TOTAL IMPLEMENTED | $9,572 | $28,165 |
$4,400
205,538
kWh
|
$5,172
-
kW-mo/yr
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |