| Assessment Year | 2007 |
|---|---|
| Principal Product | Specialty Chemicals and Pet Food |
| NAICS | 325199: All Other Basic Organic Chemical Manufacturing |
| SIC | 2869: Industrial Organic Chemicals, Not Elsewhere Classified |
| Sales Range | $1 M to 5M |
| # of Employees | 57 |
| Plant Area |
67,000
ft2
|
| Annual Production | 7,800,000
lb
|
| Production Hrs. Annual | 8,736
hrs
|
| Location (State) | Iowa |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $75,264 | 2,072,800 |
kWh
|
$0.036 |
| Electricity Demand | $65,520 | 364 |
kW-mo/yr
|
$180.00 |
| Natural Gas | $578,637 | 71,571 |
MMBtu
|
$8.08 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $31,146 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $31,146 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,031 | $13,186 |
$651
133,471
kWh
|
$3,380
-
kW-mo/yr
|
- | |
| 02 | 2.7135: Install occupancy sensors | $799 | $1,078 |
$799
21,465
kWh
|
- | - | |
| 03 | 2.2442: Preheat combustion air with waste heat | $1,146 | $2,400 | - | - |
$1,146
-
MMBtu
|
|
| 04 | 2.2135: Repair and eliminate steam leaks | $4,767 | $1,200 | - | - |
$4,767
-
MMBtu
|
|
| 05 | 2.2136: Install / repair insulation on steam lines | $10,352 | $3,350 | - | - |
$10,352
-
MMBtu
|
|
| 06 | 2.2511: Insulate bare equipment | $7,135 | $2,000 | - | - |
$7,135
-
MMBtu
|
|
| 07 | 2.4133: Use most efficient type of electric motors | $93 | $38 |
$48
1,323
kWh
|
$45
-
kW-mo/yr
|
- | |
| 08 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,443 | $215 |
$1,228
59,580
kWh
|
$215
-
kW-mo/yr
|
- | |
| 09 | 2.4221: Install compressor air intakes in coolest locations | $1,380 | $280 |
$875
24,120
kWh
|
$505
-
kW-mo/yr
|
- | |
| TOTAL RECOMMENDED | $31,146 | $23,747 |
$3,601
239,959
kWh
|
$4,145
-
kW-mo/yr
|
$23,400
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $31,146 | $23,747 |
$3,601
239,959
kWh
|
$4,145
-
kW-mo/yr
|
$23,400
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs