Assessment Year | 2006 |
---|---|
Principal Product | Handles and Latches |
NAICS | 332999: All Other Miscellaneous Fabricated Metal Product Manufacturing |
SIC | 3499: Fabricated Metal Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 300 |
Plant Area |
130,000
ft2
|
Annual Production | 5,500,000
pieces
|
Production Hrs. Annual | 8,736
hrs
|
Location (State) | Iowa |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $334,933 | 5,905,800 |
kWh
|
$0.057 |
Electricity Demand | $22,003 | 12,372 |
kW-mo/yr
|
$1.78 |
Natural Gas | $217,712 | 21,301 |
MMBtu
|
$10.22 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $101,084 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $98,813 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,419 | $512 |
$2,322
41,057
kWh
|
$97
-
kW-mo/yr
|
- | |
02 | 2.4221: Install compressor air intakes in coolest locations | $5,179 | $1,720 |
$4,964
87,852
kWh
|
$215
-
kW-mo/yr
|
- | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $36,343 | $44,874 |
$34,837
616,584
kWh
|
$1,506
-
kW-mo/yr
|
- | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $993 | $6,575 |
$841
14,893
kWh
|
$152
-
kW-mo/yr
|
- | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,589 | $7,711 |
$2,483
43,994
kWh
|
$106
-
kW-mo/yr
|
- | |
06 | 2.4133: Use most efficient type of electric motors | $116 | $158 |
$110
1,950
kWh
|
$6
-
kW-mo/yr
|
- | |
07 | 2.2514: Cover open tanks | $6,793 | $599 | - | - |
$6,793
-
MMBtu
|
|
08 | 2.2442: Preheat combustion air with waste heat | $229 | $137 | - | - |
$229
-
MMBtu
|
|
09 | 2.1134: Eliminate leaks in combustible gas lines | $765 | $667 | - | - |
$765
-
MMBtu
|
|
10 | 2.2511: Insulate bare equipment | $2,271 | $3,989 | - | - |
$2,271
-
MMBtu
|
|
11 | 2.7314: Reduce ventilation air | $38,317 | $10,141 | - | - |
$38,317
-
MMBtu
|
|
12 | 2.2614: Use cooling tower or economizer to replace chiller cooling | $5,070 | $3,770 |
$5,070
89,742
kWh
|
- | - | |
TOTAL RECOMMENDED | $101,084 | $80,853 |
$50,627
896,072
kWh
|
$2,082
-
kW-mo/yr
|
$48,375
-
MMBtu
|
||
TOTAL IMPLEMENTED | $98,813 | $76,864 |
$50,627
896,072
kWh
|
$2,082
-
kW-mo/yr
|
$46,104
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs