Assessment Year | 2006 |
---|---|
Principal Product | Primal Beef Cuts |
NAICS | 311611: Animal (except Poultry) Slaughtering |
SIC | 2011: Meat Packing Plants |
Sales Range | greater than $500 M |
# of Employees | 1,800 |
Plant Area |
520,000
ft2
|
Annual Production | 1,200,000
units
|
Production Hrs. Annual | 5,616
hrs
|
Location (State) | Nebraska |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,670,511 | 85,806,954 |
kWh
|
$0.019 |
Electricity Demand | $1,702,184 | 162,588 |
kW-mo/yr
|
$10.47 |
Electricity Fees | $3,372,996 | - |
|
- |
Natural Gas | $5,048,817 | 571,047 |
MMBtu
|
$8.84 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $192,371 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,016 | $4,118 |
$2,380
123,982
kWh
|
$2,636
-
kW-mo/yr
|
- | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $12,968 | $71,321 |
$7,048
368,962
kWh
|
$5,920
-
kW-mo/yr
|
- | |
03 | 2.7135: Install occupancy sensors | $1,397 | $385 |
$1,397
72,764
kWh
|
- | - | |
04 | 2.4221: Install compressor air intakes in coolest locations | $7,603 | $1,108 |
$3,497
184,211
kWh
|
$4,106
-
kW-mo/yr
|
- | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,632 | $60 |
$1,219
63,461
kWh
|
$1,413
-
kW-mo/yr
|
- | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $11,105 | $3,000 |
$5,143
267,883
kWh
|
$5,962
-
kW-mo/yr
|
- | |
07 | 2.4239: Eliminate or reduce compressed air usage | $1,904 | $140 |
$882
45,938
kWh
|
$1,022
-
kW-mo/yr
|
- | |
08 | 2.2136: Install / repair insulation on steam lines | $6,601 | $1,302 | - | - |
$6,601
-
MMBtu
|
|
09 | 2.2414: Use waste heat from hot flue gases to preheat | $45,154 | $2,500 | - | - |
$45,154
-
MMBtu
|
|
10 | 2.2162: Reduce excess steam bleeding | $97,991 | $10,000 | - | - |
$97,991
-
MMBtu
|
|
TOTAL RECOMMENDED | $192,371 | $93,934 |
$21,566
1,127,201
kWh
|
$21,059
-
kW-mo/yr
|
$149,746
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs