| Assessment Year | 2006 |
|---|---|
| Principal Product | Aluminum Die Casting |
| NAICS | 331523: Nonferrous Metal Die-Casting Foundries |
| SIC | 3363: Aluminum Die-Castings |
| Sales Range | $5 M to 10M |
| # of Employees | 74 |
| Plant Area |
46,000
ft2
|
| Annual Production | 2,200,000
lb
|
| Production Hrs. Annual | 6,500
hrs
|
| Location (State) | Missouri |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $107,802 | 2,856,720 |
kWh
|
$0.038 |
| Electricity Demand | $26,515 | 6,168 |
kW-mo/yr
|
$4.30 |
| Electricity Fees | $18,077 | - |
|
- |
| Natural Gas | $325,421 | 59,118 |
MMBtu
|
$5.50 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $48,092 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $394 | $344 |
$310
8,190
kWh
|
$84
-
kW-mo/yr
|
- | |
| 02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $376 | $42 |
$296
7,800
kWh
|
$80
-
kW-mo/yr
|
- | |
| 03 | 2.4221: Install compressor air intakes in coolest locations | $1,332 | $322 |
$1,057
27,902
kWh
|
$275
-
kW-mo/yr
|
- | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,671 | $4,008 |
$1,240
32,734
kWh
|
$431
-
kW-mo/yr
|
- | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $848 | $1,836 |
$667
17,589
kWh
|
$181
-
kW-mo/yr
|
- | |
| 06 | 2.7135: Install occupancy sensors | $667 | $77 |
$667
17,586
kWh
|
- | - | |
| 07 | 2.4133: Use most efficient type of electric motors | $493 | $305 |
$388
10,236
kWh
|
$105
-
kW-mo/yr
|
- | |
| 08 | 2.1133: Adjust burners for efficient operation | $24,825 | $2,100 | - | - |
$24,825
-
MMBtu
|
|
| 09 | 2.4321: Upgrade obsolete equipment | $17,486 | $87,000 | - | - |
$17,486
-
MMBtu
|
|
| TOTAL RECOMMENDED | $48,092 | $96,034 |
$4,625
122,037
kWh
|
$1,156
-
kW-mo/yr
|
$42,311
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs