Assessment Year | 2005 |
---|---|
Principal Product | Printed Materials |
NAICS | 323111: Commercial Printing (except Screen and Books) |
SIC | 2752: Commercial Printing, Lithographic |
Sales Range | $10 M to 50M |
# of Employees | 220 |
Plant Area |
231,500
ft2
|
Annual Production | 15,000
ton
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Missouri |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $274,452 | 8,632,000 |
kWh
|
$0.032 |
Electricity Demand | $108,195 | 19,368 |
kW-mo/yr
|
$5.59 |
Electricity Fees | $91,936 | - |
|
- |
Natural Gas | $243,926 | 36,638 |
MMBtu
|
$6.66 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $567,913 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Water Consumption Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $464 | $51 |
$230
10,608
kWh
|
$234
-
kW-mo/yr
|
- | - | - | - | |
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,156 | $40 |
$1,070
49,296
kWh
|
$1,086
-
kW-mo/yr
|
- | - | - | - | |
03 | 2.4221: Install compressor air intakes in coolest locations | $1,908 | $1,094 |
$979
45,106
kWh
|
$929
-
kW-mo/yr
|
- | - | - | - | |
04 | 2.2437: Recover waste heat from equipment | $5,440 | $1,650 | - | - |
$5,440
-
MMBtu
|
- | - | - | |
05 | 2.4133: Use most efficient type of electric motors | $265 | $304 |
$131
6,037
kWh
|
$134
-
kW-mo/yr
|
- | - | - | - | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $250 | $349 |
$124
5,703
kWh
|
$126
-
kW-mo/yr
|
- | - | - | - | |
07 | 3.4154: Eliminate leaks in water lines and valves | $2,035 | $160 | - | - | - | - | - |
$2,035
-
Tgal
|
|
08 | 3.1192: Reduce scrap production | $49,000 | $500 | - | - | - |
$49,000
-
lb
|
- | - | |
09 | 4.652: Replace existing equipment with more suitable substitutes | $499,200 | $800,000 | - | - | - | - | $499,200 | - | |
10 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,683 | $20,487 |
$1,727
79,454
kWh
|
$2,956
-
kW-mo/yr
|
- | - | - | - | |
11 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,703 | $2,772 |
$846
38,958
kWh
|
$857
-
kW-mo/yr
|
- | - | - | - | |
12 | 2.7135: Install occupancy sensors | $809 | $2,233 |
$809
37,298
kWh
|
- | - | - | - | - | |
TOTAL RECOMMENDED | $567,913 | $829,640 |
$5,916
272,460
kWh
|
$6,322
-
kW-mo/yr
|
$5,440
-
MMBtu
|
$49,000
-
lb
|
$499,200 |
$2,035
-
Tgal
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Water Consumption Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs