ITAC Assessment: IA0369
ITAC logo
ITAC Assessment: IA0369
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Printed Materials
NAICS 323111: Commercial Printing (except Screen and Books)
SIC 2752: Commercial Printing, Lithographic
Sales Range $10
M
to 50
M
# of Employees 220
Plant Area 231,500
ft2
Annual Production 15,000
ton
Production Hrs. Annual 6,240
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $274,452 8,632,000
kWh
Electricity Demand $108,195 19,368
kW-mo/yr
Electricity Fees $91,936 -
Natural Gas $243,926 36,638
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $567,913 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Water Consumption Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $464 $51 $230
10,608
kWh
$234
-
kW-mo/yr
- - - -
02 2.4231: Reduce the pressure of compressed air to the minimum required $2,156 $40 $1,070
49,296
kWh
$1,086
-
kW-mo/yr
- - - -
03 2.4221: Install compressor air intakes in coolest locations $1,908 $1,094 $979
45,106
kWh
$929
-
kW-mo/yr
- - - -
04 2.2437: Recover waste heat from equipment $5,440 $1,650 - - $5,440
-
MMBtu
- - -
05 2.4133: Use most efficient type of electric motors $265 $304 $131
6,037
kWh
$134
-
kW-mo/yr
- - - -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $250 $349 $124
5,703
kWh
$126
-
kW-mo/yr
- - - -
07 3.4154: Eliminate leaks in water lines and valves $2,035 $160 - - - - - $2,035
-
Tgal
08 3.1192: Reduce scrap production $49,000 $500 - - - $49,000
-
lb
- -
09 4.652: Replace existing equipment with more suitable substitutes $499,200 $800,000 - - - - $499,200 -
10 2.7142: Utilize higher efficiency lamps and/or ballasts $4,683 $20,487 $1,727
79,454
kWh
$2,956
-
kW-mo/yr
- - - -
11 2.7142: Utilize higher efficiency lamps and/or ballasts $1,703 $2,772 $846
38,958
kWh
$857
-
kW-mo/yr
- - - -
12 2.7135: Install occupancy sensors $809 $2,233 $809
37,298
kWh
- - - - -
TOTAL RECOMMENDED $567,913 $829,640 $5,916
272,460
kWh
$6,322
-
kW-mo/yr
$5,440
-
MMBtu
$49,000
-
lb
$499,200 $2,035
-
Tgal
TOTAL IMPLEMENTED - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs