ITAC Assessment: IA0365
ITAC logo
ITAC Assessment: IA0365
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Glass vials
NAICS 327215: Glass Product Manufacturing Made of Purchased Glass
SIC 3231: Glass Products, Made of Purchased Glass
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 46,000
ft2
Annual Production 134,400,000
pieces
Production Hrs. Annual 8,064
hrs
Location (State) Nebraska

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $73,310 3,040,848
kWh
Electricity Demand $35,589 5,004
kW-mo/yr
Natural Gas $306,657 39,782
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $1,038,362 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,025,719

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings Primary Product Savings
01 2.4221: Install compressor air intakes in coolest locations $1,317 $50 $1,051
43,626
kWh
$266
-
kW-mo/yr
- - - -
02 2.4231: Reduce the pressure of compressed air to the minimum required $779 $19 $622
25,805
kWh
$157
-
kW-mo/yr
- - - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,995 $3,000 $1,592
66,043
kWh
$403
-
kW-mo/yr
- - - -
04 2.7135: Install occupancy sensors $1,148 $1,001 $1,148
47,639
kWh
- - - - -
05 2.7243: Improve air circulation with destratification fans / other methods $628 $1,600 - - $628
-
MMBtu
- - -
06 4.514: Re-arrange equipment layout to reduce handling costs $1,000,000 $152,672 - - - - - $1,000,000
07 4.322: Eliminate old stock and modify inventory control $11,495 $14,000 - - - $11,495 - -
08 4.624: Hire additional personnel to reduce changeout time $21,000 $7,216 - - - - $21,000 -
TOTAL RECOMMENDED $1,038,362 $179,558 $4,413
183,113
kWh
$826
-
kW-mo/yr
$628
-
MMBtu
$11,495 $21,000 $1,000,000
TOTAL IMPLEMENTED $1,025,719 $164,557 $3,265
135,474
kWh
$826
-
kW-mo/yr
$628
-
MMBtu
- $21,000 $1,000,000
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs