ITAC Assessment: IA0347
ITAC logo
ITAC Assessment: IA0347
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product grain storage bins
NAICS 333241: Food Product Machinery Manufacturing
SIC 3556: Food Products Machinery
Sales Range $10
M
to 50
M
# of Employees 80
Plant Area 400,000
ft2
Annual Production 2,500
pieces
Production Hrs. Annual 3,876
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $121,249 2,797,520
kWh
Electricity Demand $41,161 8,436
kW-mo/yr
Electricity Fees $28,774 -
Natural Gas $178,510 26,919
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $48,080 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $17,525

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $1,115 $14 $659
20,543
kWh
$456
-
kW-mo/yr
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,623 $920 $3,317
103,323
kWh
$2,306
-
kW-mo/yr
-
03 2.4221: Install compressor air intakes in coolest locations $3,243 $1,090 $1,941
60,467
kWh
$1,302
-
kW-mo/yr
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,608 $2,591 $951
29,620
kWh
$657
-
kW-mo/yr
-
05 2.7135: Install occupancy sensors $1,911 $1,820 $1,911
59,521
kWh
- -
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $929 $457 $473
14,729
kWh
$456
-
kW-mo/yr
-
07 2.6218: Turn off equipment when not in use $3,967 $148 $2,231
69,500
kWh
$1,736
-
kW-mo/yr
-
08 2.4322: Use or replace with energy efficient substitutes $29,440 $50,000 - - $29,440
-
MMBtu
09 2.7124: Make a practice of turning off lights when not needed $244 - $107
3,328
kWh
$138
-
kW-mo/yr
-
TOTAL RECOMMENDED $48,080 $57,040 $11,589
361,031
kWh
$7,051
-
kW-mo/yr
$29,440
-
MMBtu
TOTAL IMPLEMENTED $17,525 $7,026 $10,930
340,488
kWh
$6,595
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs