ITAC Assessment: IA0344
ITAC logo
ITAC Assessment: IA0344
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product processed beef
NAICS 311611: Animal (except Poultry) Slaughtering
SIC 2011: Meat Packing Plants
Sales Range $50
M
to 100
M
# of Employees 125
Plant Area 43,000
ft2
Annual Production 83,200
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Minnesota

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $131,004 3,858,000
kWh
Electricity Demand $67,299 8,880
kW-mo/yr
Natural Gas $204,854 29,400
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $17,580 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.2427: Use waste heat from hot flue gases to preheat incoming fluids $6,831 $13,500 - - $6,831
-
MMBtu
02 2.2449: Recover heat from exhausted steam, hot air or hot water $1,161 $2,300 - - $1,161
-
MMBtu
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,472 $254 $848
25,082
kWh
$624
-
kW-mo/yr
-
04 2.4221: Install compressor air intakes in coolest locations $997 $166 $582
17,113
kWh
$415
-
kW-mo/yr
-
05 2.4231: Reduce the pressure of compressed air to the minimum required $413 $25 $238
7,020
kWh
$175
-
kW-mo/yr
-
06 2.2437: Recover waste heat from equipment $913 $857 - - $913
-
MMBtu
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,449 $7,025 $1,412
41,652
kWh
$1,037
-
kW-mo/yr
-
08 2.7142: Utilize higher efficiency lamps and/or ballasts $1,027 $198 $696
20,545
kWh
$331
-
kW-mo/yr
-
09 2.7142: Utilize higher efficiency lamps and/or ballasts $2,065 $4,616 $1,228
36,300
kWh
$837
-
kW-mo/yr
-
10 2.4111: Utilize energy-efficient belts and other improved mechanisms $252 $630 $181
7,972
kWh
$71
-
kW-mo/yr
-
TOTAL RECOMMENDED $17,580 $29,571 $5,185
155,684
kWh
$3,490
-
kW-mo/yr
$8,905
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs