ITAC Assessment: UM0208
ITAC logo
ITAC Assessment: UM0208
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Sheet Fed Printing
NAICS
n/a
SIC 2752: Commercial Printing, Lithographic
Sales Range $10
M
to 50
M
# of Employees 60
Plant Area 40,000
ft2
Annual Production 0
units
Production Hrs. Annual 4,160
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $37,319 1,057,996
kWh
Electricity Demand $37,781 3,924
kW-mo/yr
Electricity Fees $2,173 -
Natural Gas $8,679 1,681
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $5,842 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,842

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7111: Reduce illumination to minimum necessary levels $1,164 $650 $635
18,038
kWh
$529
-
kW-mo/yr
02 2.7142: Utilize higher efficiency lamps and/or ballasts $3,036 $10,015 $1,651
47,224
kWh
$1,385
-
kW-mo/yr
03 2.7124: Make a practice of turning off lights when not needed $1,158 $100 $1,158
32,000
kWh
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $484 $150 $186
5,336
kWh
$298
-
kW-mo/yr
TOTAL RECOMMENDED $5,842 $10,915 $3,630
102,598
kWh
$2,212
-
kW-mo/yr
TOTAL IMPLEMENTED $5,842 $10,915 $3,630
102,598
kWh
$2,212
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs