Assessment Year | 2003 |
---|---|
Principal Product | Spices |
NAICS | 311942: Spice and Extract Manufacturing |
SIC | 2099: Food Preparations, Not Elsewhere Classified |
Sales Range | $100 M to 500M |
# of Employees | 500 |
Plant Area |
725,000
ft2
|
Annual Production | 148,000,000
pieces
|
Production Hrs. Annual | 3,120
hrs
|
Location (State) | Iowa |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $498,112 | 17,228,248 |
kWh
|
$0.029 |
Electricity Demand | $182,982 | 32,172 |
kW-mo/yr
|
$5.69 |
Electricity Fees | $10,673 | - |
|
- |
Natural Gas | $147,617 | 21,689 |
MMBtu
|
$6.81 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $57,784 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $53,325 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,039 | $44 |
$321
16,536
kWh
|
$718
-
kW-mo/yr
|
- | |
02 | 2.4221: Install compressor air intakes in coolest locations | $3,420 | $544 |
$955
49,249
kWh
|
$2,465
-
kW-mo/yr
|
- | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $6,880 | $277 |
$2,126
109,607
kWh
|
$4,754
-
kW-mo/yr
|
- | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,053 | $8,284 |
$926
47,754
kWh
|
$2,127
-
kW-mo/yr
|
- | |
05 | 2.4133: Use most efficient type of electric motors | $48 | $67 |
$27
1,417
kWh
|
$21
-
kW-mo/yr
|
- | |
06 | 3.5313: Increase amount of waste recovered for resale | $43,344 | $11,000 | - | - | $43,344 | |
TOTAL RECOMMENDED | $57,784 | $20,216 |
$4,355
224,563
kWh
|
$10,085
-
kW-mo/yr
|
$43,344 | ||
TOTAL IMPLEMENTED | $53,325 | $19,628 |
$3,079
158,778
kWh
|
$6,902
-
kW-mo/yr
|
$43,344 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs