Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Frozen Peas and Corn
NAICS 311411: Frozen Fruit, Juice, and Vegetable Manufacturing
SIC 2037: Frozen Fruits, Fruit Juices, and Vegetables
Sales Range $10
M
to 50
M
# of Employees 115
Plant Area 374,000
ft2
Annual Production 57,000,000
lb
Production Hrs. Annual 4,632
hrs
Location (State) Minnesota

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $547,908 16,868,638
kWh
Electricity Demand $417,462 46,570
kW-mo/yr
Natural Gas $294,260 73,375
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $50,766 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,786

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $1,889 $1,000 - - $1,889
-
MMBtu
02 2.1213: Direct warmest air to combustion intake $916 $1,734 - - $916
-
MMBtu
03 2.2427: Use waste heat from hot flue gases to preheat incoming fluids $34,175 $36,000 - - $34,175
-
MMBtu
04 2.4231: Reduce the pressure of compressed air to the minimum required $487 $23 $327
10,191
kWh
$160
-
kW-mo/yr
-
05 2.4221: Install compressor air intakes in coolest locations $1,233 $220 $933
29,054
kWh
$300
-
kW-mo/yr
-
06 2.4133: Use most efficient type of electric motors $4,040 $99 $2,714
84,544
kWh
$1,326
-
kW-mo/yr
-
07 2.7142: Utilize higher efficiency lamps and/or ballasts $4,173 $7,342 $2,715
84,581
kWh
$1,458
-
kW-mo/yr
-
08 2.7142: Utilize higher efficiency lamps and/or ballasts $866 $1,149 $583
18,177
kWh
$283
-
kW-mo/yr
-
09 2.7124: Make a practice of turning off lights when not needed $2,303 - $2,303
71,756
kWh
- -
10 2.7135: Install occupancy sensors $684 $1,064 $684
21,306
kWh
- -
TOTAL RECOMMENDED $50,766 $48,631 $10,259
319,609
kWh
$3,527
-
kW-mo/yr
$36,980
-
MMBtu
TOTAL IMPLEMENTED $13,786 $9,897 $10,259
319,609
kWh
$3,527
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs