ITAC Assessment: IA0324
ITAC logo
ITAC Assessment: IA0324
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Kiln-dried hardwoods, hardwood floorings
NAICS 321918: Other Millwork (including Flooring)
SIC 2426: Hardwood Dimension and Flooring Mills
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 200,000
ft2
Annual Production 0
units
Production Hrs. Annual 3,500
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $62,267 2,310,303
kWh
Electricity Demand $88,523 10,932
kW-mo/yr
Natural Gas $4,585 743
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $17,816 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,996

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,364 $157 $722
26,460
kWh
$642
-
kW-mo/yr
-
02 2.4221: Install compressor air intakes in coolest locations $936 $446 $497
18,197
kWh
$439
-
kW-mo/yr
-
03 2.4231: Reduce the pressure of compressed air to the minimum required $572 $712 $303
11,095
kWh
$269
-
kW-mo/yr
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $632 $124 $390
14,271
kWh
$242
-
kW-mo/yr
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $2,661 $6,189 $1,387
50,812
kWh
$1,274
-
kW-mo/yr
-
06 2.3212: Optimize plant power factor $11,651 $20,000 - - $11,651
TOTAL RECOMMENDED $17,816 $27,628 $3,299
120,835
kWh
$2,866
-
kW-mo/yr
$11,651
TOTAL IMPLEMENTED $1,996 $281 $1,112
40,731
kWh
$884
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs