Assessment Year | 2003 |
---|---|
Principal Product | custom metal fabrications |
NAICS | 331318: Other Aluminum Rolling, Drawing, and Extruding |
SIC | 3491: Industrial Valves |
Sales Range | $10 M to 50M |
# of Employees | 265 |
Plant Area |
305,000
ft2
|
Annual Production | 4,340
ton
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Minnesota |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $142,077 | 4,273,996 |
kWh
|
$0.033 |
Electricity Demand | $88,140 | 12,816 |
kW-mo/yr
|
$6.88 |
Natural Gas | $91,845 | 22,179 |
MMBtu
|
$4.14 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $14,617 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $7,073 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,618 | $1,298 |
$2,169
65,519
kWh
|
$449
-
kW-mo/yr
|
|
02 | 2.4221: Install compressor air intakes in coolest locations | $1,258 | $304 |
$991
30,073
kWh
|
$267
-
kW-mo/yr
|
|
03 | 2.4224: Upgrade controls on compressors | $4,635 | $2,000 |
$3,096
93,548
kWh
|
$1,539
-
kW-mo/yr
|
|
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $748 | $737 |
$596
18,034
kWh
|
$152
-
kW-mo/yr
|
|
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,455 | $8,642 |
$3,236
97,760
kWh
|
$1,219
-
kW-mo/yr
|
|
06 | 2.7135: Install occupancy sensors | $903 | $1,639 |
$903
27,257
kWh
|
- | |
TOTAL RECOMMENDED | $14,617 | $14,620 |
$10,991
332,191
kWh
|
$3,626
-
kW-mo/yr
|
||
TOTAL IMPLEMENTED | $7,073 | $9,940 |
$5,405
163,279
kWh
|
$1,668
-
kW-mo/yr
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs