Assessment Year | 2003 |
---|---|
Principal Product | Precision Shafts |
NAICS | 336350: Motor Vehicle Transmission and Power Train Parts Manufacturing |
SIC | 3714: Motor Vehicle Parts and Accessories |
Sales Range | $10 M to 50M |
# of Employees | 147 |
Plant Area |
102,000
ft2
|
Annual Production | 5,000,000
lb
|
Production Hrs. Annual | 4,160
hrs
|
Location (State) | Iowa |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $147,292 | 4,319,311 |
kWh
|
$0.034 |
Electricity Demand | $51,154 | 14,832 |
kW-mo/yr
|
$3.45 |
Natural Gas | $47,353 | 9,132 |
MMBtu
|
$5.19 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $15,517 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $8,364 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Water Consumption Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,975 | $383 |
$1,529
44,848
kWh
|
$446
-
kW-mo/yr
|
- | - | - | |
02 | 2.4221: Install compressor air intakes in coolest locations | $1,505 | $415 |
$935
27,410
kWh
|
$570
-
kW-mo/yr
|
- | - | - | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $551 | $18 |
$348
10,192
kWh
|
$203
-
kW-mo/yr
|
- | - | - | |
04 | 2.7135: Install occupancy sensors | $118 | $333 |
$118
3,472
kWh
|
- | - | - | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,381 | $807 |
$1,844
54,080
kWh
|
$537
-
kW-mo/yr
|
- | - | - | |
06 | 3.4154: Eliminate leaks in water lines and valves | $121 | $23 | - | - | - |
$33
-
Tgal
|
$88
-
Tgal
|
|
07 | 2.7245: Use direct air supply to exhaust hoods | $5,530 | $2,910 | - | - |
$5,530
-
MMBtu
|
- | - | |
08 | 2.4226: Use / purchase optimum sized compressor | $3,336 | $4,442 |
$3,336
97,843
kWh
|
- | - | - | - | |
TOTAL RECOMMENDED | $15,517 | $9,331 |
$8,110
237,845
kWh
|
$1,756
-
kW-mo/yr
|
$5,530
-
MMBtu
|
$33
-
Tgal
|
$88
-
Tgal
|
||
TOTAL IMPLEMENTED | $8,364 | $5,673 |
$7,057
206,963
kWh
|
$1,186
-
kW-mo/yr
|
- |
$33
-
Tgal
|
$88
-
Tgal
|
||