ITAC Assessment: AM0184
ITAC logo
ITAC Assessment: AM0184
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product repair and manufacture of prefabrica
NAICS
n/a
SIC 3441: Fabricated Structural Metal
Sales Range $10
M
to 50
M
# of Employees 267
Plant Area 957,000
ft2
Annual Production 450
pieces
Production Hrs. Annual 4,032
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $365,675 5,372,509
kWh
Natural Gas $63,682 20,980
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $21,561 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Other Energy Savings
01 2.3212: Optimize plant power factor $13,967 $31,500 $13,967
-
kWh
-
02 2.6212: Turn off equipment during breaks, reduce operating time $2,850 - $2,850
72,978
kWh
-
03 2.7124: Make a practice of turning off lights when not needed $2,740 $608 $2,740
63,306
kWh
-
04 2.2136: Install / repair insulation on steam lines $1,314 $2,511 - $1,314
-
MMBtu
05 2.4314: Use synthetic lubricant $690 - $690
9,086
kWh
-
TOTAL RECOMMENDED $21,561 $34,619 $20,247
145,370
kWh
$1,314
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs