Assessment Year | 2003 |
---|---|
Principal Product | Meat Packaging |
NAICS | 311613: Rendering and Meat Byproduct Processing |
SIC | 2013: Sausages and Other Prepared Meat Products |
Sales Range | $10 M to 50M |
# of Employees | 150 |
Plant Area |
87,674
ft2
|
Annual Production | 10,500
ton
|
Production Hrs. Annual | 2,500
hrs
|
Location (State) | Nebraska |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $317,163 | 8,986,105 |
kWh
|
$0.035 |
Natural Gas | $66,743 | 13,293 |
MMBtu
|
$5.02 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $17,293 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $6,083 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|
01 | 2.4133: Use most efficient type of electric motors | $3,140 | $4,916 |
$3,140
89,230
kWh
|
- | - | |
02 | 2.4221: Install compressor air intakes in coolest locations | $551 | $64 |
$551
15,649
kWh
|
- | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $367 | $20 |
$367
10,425
kWh
|
- | - | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $167 | $14 |
$167
4,750
kWh
|
- | - | |
05 | 2.2427: Use waste heat from hot flue gases to preheat incoming fluids | $6,380 | $18,000 | - |
$6,380
-
MMBtu
|
- | |
06 | 2.1233: Analyze flue gas for proper air/fuel ratio | $1,330 | $1,000 | - |
$1,330
-
MMBtu
|
- | |
07 | 2.1213: Direct warmest air to combustion intake | $528 | $800 | - |
$528
-
MMBtu
|
- | |
08 | 2.7135: Install occupancy sensors | $779 | $1,530 |
$779
22,143
kWh
|
- | - | |
09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $560 | $560 |
$560
15,876
kWh
|
- | - | |
10 | 2.7135: Install occupancy sensors | $522 | $860 |
$522
14,822
kWh
|
- | - | |
11 | 3.3122: Use filtration, centrifuging to remove contaminants | $2,969 | $5,770 | - | - | $2,969 | |
TOTAL RECOMMENDED | $17,293 | $33,534 |
$6,086
172,895
kWh
|
$8,238
-
MMBtu
|
$2,969 | ||
TOTAL IMPLEMENTED | $6,083 | $6,814 |
$4,225
120,054
kWh
|
$1,858
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs