ITAC Assessment: IA0312
ITAC logo
ITAC Assessment: IA0312
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Steel castings
NAICS 331513: Steel Foundries (except Investment)
SIC 3325: Steel Foundries, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 155
Plant Area 210,000
ft2
Annual Production 12,000
ton
Production Hrs. Annual 4,160
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $784,399 24,383,273
kWh
Electricity Demand $232,891 28,476
kW-mo/yr
Natural Gas $1,422,769 227,919
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $76,649 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,462

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings One-time Revenue or Avoided Cost Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $9,964 $779 $6,791
210,915
kWh
$3,173
-
kW-mo/yr
-
02 2.4231: Reduce the pressure of compressed air to the minimum required $2,291 $25 $1,502
46,650
kWh
$789
-
kW-mo/yr
-
03 2.4226: Use / purchase optimum sized compressor $58,932 $136,000 $25,577
777,530
kWh
$8,355
-
kW-mo/yr
$25,000
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,061 - $662
20,491
kWh
$399
-
kW-mo/yr
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,976 $8,950 $1,068
33,168
kWh
$908
-
kW-mo/yr
-
06 2.7135: Install occupancy sensors $677 $2,261 $677
21,022
kWh
- -
07 2.4133: Use most efficient type of electric motors $1,748 $1,356 $1,136
35,287
kWh
$612
-
kW-mo/yr
-
TOTAL RECOMMENDED $76,649 $149,371 $37,413
1,145,063
kWh
$14,236
-
kW-mo/yr
$25,000
TOTAL IMPLEMENTED $5,462 $12,567 $3,543
109,968
kWh
$1,919
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs