Assessment Year | 2002 |
---|---|
Principal Product | aerospace sensors |
NAICS |
n/a
|
SIC | 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified |
Sales Range | $50 M to 100M |
# of Employees | 250 |
Plant Area |
63,000
ft2
|
Annual Production | 30,000
pieces
|
Production Hrs. Annual | 2,574
hrs
|
Location (State) | Minnesota |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $146,973 | 3,924,370 |
kWh
|
$0.037 |
Electricity Demand | $77,070 | 10,188 |
kW-mo/yr
|
$7.56 |
Natural Gas | $49,948 | 7,433 |
MMBtu
|
$6.72 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $19,219 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $1,236 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,423 | $6,500 |
$1,847
49,795
kWh
|
$576
-
kW-mo/yr
|
- | - | |
02 | 2.4221: Install compressor air intakes in coolest locations | $1,323 | $120 |
$1,021
27,491
kWh
|
$302
-
kW-mo/yr
|
- | - | |
03 | 2.7135: Install occupancy sensors | $307 | $333 |
$307
8,282
kWh
|
- | - | - | |
04 | 2.7111: Reduce illumination to minimum necessary levels | $409 | $36 |
$199
5,354
kWh
|
$210
-
kW-mo/yr
|
- | - | |
05 | 2.7312: Minimize use of outside make-up air for ventilation except when used for economizer cycle | $13,521 | $5,000 |
$293
7,318
kWh
|
$3,442
-
kW-mo/yr
|
$9,786
-
MMBtu
|
- | |
06 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $1,236 | $665 | - | - | - | $1,236 | |
TOTAL RECOMMENDED | $19,219 | $12,654 |
$3,667
98,240
kWh
|
$4,530
-
kW-mo/yr
|
$9,786
-
MMBtu
|
$1,236 | ||
TOTAL IMPLEMENTED | $1,236 | $665 | - | - | - | $1,236 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs