Assessment Year | 2002 |
---|---|
Principal Product | bar code label, label applications |
NAICS |
n/a
|
SIC | 2671: Packaging Paper and Plastics Film, Coated and Laminated |
Sales Range | $10 M to 50M |
# of Employees | 141 |
Plant Area |
94,061
ft2
|
Annual Production | 832,000,000
pieces
|
Production Hrs. Annual | 5,500
hrs
|
Location (State) | Minnesota |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $62,267 | 1,651,673 |
kWh
|
$0.038 |
Electricity Demand | $36,995 | 4,524 |
kW-mo/yr
|
$8.18 |
Natural Gas | $45,384 | 4,781 |
MMBtu
|
$9.49 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $7,925 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $2,821 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $433 | $19 |
$324
8,694
kWh
|
$109
-
kW-mo/yr
|
- | - | |
02 | 2.4221: Install compressor air intakes in coolest locations | $436 | $367 |
$328
8,793
kWh
|
$108
-
kW-mo/yr
|
- | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,939 | $4,498 |
$1,185
31,770
kWh
|
$754
-
kW-mo/yr
|
- | - | |
04 | 2.7135: Install occupancy sensors | $151 | $266 |
$151
4,051
kWh
|
- | - | - | |
05 | 2.3212: Optimize plant power factor | $2,000 | $2,694 | - | - | $2,000 | - | |
06 | 2.2522: Isolate hot or cold equipment | $578 | $446 |
$263
7,044
kWh
|
$315
-
kW-mo/yr
|
- | - | |
07 | 2.7312: Minimize use of outside make-up air for ventilation except when used for economizer cycle | $2,388 | $3,000 | - |
$661
-
kW-mo/yr
|
- |
$1,727
-
MMBtu
|
|
TOTAL RECOMMENDED | $7,925 | $11,290 |
$2,251
60,352
kWh
|
$1,947
-
kW-mo/yr
|
$2,000 |
$1,727
-
MMBtu
|
||
TOTAL IMPLEMENTED | $2,821 | $3,019 |
$324
8,694
kWh
|
$770
-
kW-mo/yr
|
- |
$1,727
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs