ITAC Assessment: IA0297
ITAC logo
ITAC Assessment: IA0297
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Modular mobile houses
NAICS
n/a
SIC 2457:
Sales Range $10
M
to 50
M
# of Employees 170
Plant Area 100,000
ft2
Annual Production 1,200
pieces
Production Hrs. Annual 2,340
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $25,106 793,536
kWh
Electricity Demand $32,326 3,312
kW-mo/yr
Natural Gas $60,793 6,604
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $47,985 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,667

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings By-product Production Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,367 $443 $518
16,335
kWh
$849
-
kW-mo/yr
- - -
02 2.4221: Install compressor air intakes in coolest locations $705 $169 $214
6,756
kWh
$491
-
kW-mo/yr
- - -
03 4.111: Add equipment/ operators to reduce production bottleneck $12,209 $8,444 $626
19,760
kWh
$2,223
-
kW-mo/yr
- $9,360 -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,300 $237 $504
15,912
kWh
$796
-
kW-mo/yr
- - -
05 2.7135: Install occupancy sensors $104 $333 $104
3,272
kWh
- - - -
06 3.1191: Change procedures / equipment / operating conditions $32,300 $15,336 - - $28,900
-
lb
- $3,400
TOTAL RECOMMENDED $47,985 $24,962 $1,966
62,035
kWh
$4,359
-
kW-mo/yr
$28,900
-
lb
$9,360 $3,400
TOTAL IMPLEMENTED $2,667 $680 $1,022
32,247
kWh
$1,645
-
kW-mo/yr
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings By-product Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs