Assessment Year | 2002 |
---|---|
Principal Product | Modular mobile houses |
NAICS |
n/a
|
SIC | 2457: |
Sales Range | $10 M to 50M |
# of Employees | 170 |
Plant Area |
100,000
ft2
|
Annual Production | 1,200
pieces
|
Production Hrs. Annual | 2,340
hrs
|
Location (State) | Iowa |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $25,106 | 793,536 |
kWh
|
$0.032 |
Electricity Demand | $32,326 | 3,312 |
kW-mo/yr
|
$9.76 |
Natural Gas | $60,793 | 6,604 |
MMBtu
|
$9.21 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $47,985 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $2,667 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | By-product Production Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,367 | $443 |
$518
16,335
kWh
|
$849
-
kW-mo/yr
|
- | - | - | |
02 | 2.4221: Install compressor air intakes in coolest locations | $705 | $169 |
$214
6,756
kWh
|
$491
-
kW-mo/yr
|
- | - | - | |
03 | 4.111: Add equipment/ operators to reduce production bottleneck | $12,209 | $8,444 |
$626
19,760
kWh
|
$2,223
-
kW-mo/yr
|
- | $9,360 | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,300 | $237 |
$504
15,912
kWh
|
$796
-
kW-mo/yr
|
- | - | - | |
05 | 2.7135: Install occupancy sensors | $104 | $333 |
$104
3,272
kWh
|
- | - | - | - | |
06 | 3.1191: Change procedures / equipment / operating conditions | $32,300 | $15,336 | - | - |
$28,900
-
lb
|
- | $3,400 | |
TOTAL RECOMMENDED | $47,985 | $24,962 |
$1,966
62,035
kWh
|
$4,359
-
kW-mo/yr
|
$28,900
-
lb
|
$9,360 | $3,400 | ||
TOTAL IMPLEMENTED | $2,667 | $680 |
$1,022
32,247
kWh
|
$1,645
-
kW-mo/yr
|
- | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | By-product Production Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs