| Assessment Year | 1996 |
|---|---|
| Principal Product | military rations |
| NAICS |
n/a
|
| SIC | 2099: Food Preparations, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 140 |
| Plant Area |
189,000
ft2
|
| Annual Production | 20,000,000
pieces
|
| Production Hrs. Annual | 4,800
hrs
|
| Location (State) | Ohio |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $148,611 | 3,910,317 |
kWh
|
$0.038 |
| Electricity Demand | $125,856 | 10,432 |
kW-mo/yr
|
$12.06 |
| Natural Gas | $137,761 | 29,084 |
MMBtu
|
$4.74 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $51,632 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $51,632 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings | Water Consumption Savings |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.3212: Optimize plant power factor | $12,351 | $9,000 | - |
$12,351
-
kW-mo/yr
|
- | - | - | - | - | - | |
| 02 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $15,214 | - | - |
$16,294
-
kW-mo/yr
|
- | - | - | $(-1,080.0) | - | - | |
| 03 | 3.4157: Replace water cooling on processes with air cooling | $8,648 | $4,000 |
$(-298.0)
(-15,240)
kWh
|
$(-602.0)
-
kW-mo/yr
|
- |
$9,548
-
Tgal
|
- | - | - | - | |
| 04 | 2.4239: Eliminate or reduce compressed air usage | $7,221 | $500 |
$1,447
74,736
kWh
|
- | - |
$2,580
-
Tgal
|
- | - | $1,000 |
$2,194
-
Tgal
|
|
| 05 | 2.2437: Recover waste heat from equipment | $4,110 | $6,000 |
$291
14,947
kWh
|
- |
$3,819
-
MMBtu
|
- | - | - | - | - | |
| 06 | 2.7111: Reduce illumination to minimum necessary levels | $2,448 | $1,000 |
$729
37,515
kWh
|
$1,476
-
kW-mo/yr
|
- | - | $243 | - | - | - | |
| 07 | 3.4116: Meter recycled water (to reduce sewer charges) | $1,640 | - | - | - | - |
$1,640
-
Tgal
|
- | - | - | - | |
| TOTAL RECOMMENDED | $51,632 | $20,500 |
$2,169
111,958
kWh
|
$29,519
-
kW-mo/yr
|
$3,819
-
MMBtu
|
$13,768
-
Tgal
|
$243 | $(-1,080.0) | $1,000 |
$2,194
-
Tgal
|
||
| TOTAL IMPLEMENTED | $51,632 | $20,500 |
$2,169
111,958
kWh
|
$29,519
-
kW-mo/yr
|
$3,819
-
MMBtu
|
$13,768
-
Tgal
|
$243 | $(-1,080.0) | $1,000 |
$2,194
-
Tgal
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings | Water Consumption Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs