ITAC Assessment: UD0505
ITAC logo
ITAC Assessment: UD0505
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product military rations
NAICS
n/a
SIC 2099: Food Preparations, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 140
Plant Area 189,000
ft2
Annual Production 20,000,000
pieces
Production Hrs. Annual 4,800
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $148,611 3,910,317
kWh
Electricity Demand $125,856 10,432
kW-mo/yr
Natural Gas $137,761 29,084
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $51,632 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $51,632

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings Water Consumption Savings
01 2.3212: Optimize plant power factor $12,351 $9,000 - $12,351
-
kW-mo/yr
- - - - - -
02 2.3131: Reschedule plant operations or reduce load to avoid peaks $15,214 - - $16,294
-
kW-mo/yr
- - - $(-1,080.0) - -
03 3.4157: Replace water cooling on processes with air cooling $8,648 $4,000 $(-298.0)
(-15,240)
kWh
$(-602.0)
-
kW-mo/yr
- $9,548
-
Tgal
- - - -
04 2.4239: Eliminate or reduce compressed air usage $7,221 $500 $1,447
74,736
kWh
- - $2,580
-
Tgal
- - $1,000 $2,194
-
Tgal
05 2.2437: Recover waste heat from equipment $4,110 $6,000 $291
14,947
kWh
- $3,819
-
MMBtu
- - - - -
06 2.7111: Reduce illumination to minimum necessary levels $2,448 $1,000 $729
37,515
kWh
$1,476
-
kW-mo/yr
- - $243 - - -
07 3.4116: Meter recycled water (to reduce sewer charges) $1,640 - - - - $1,640
-
Tgal
- - - -
TOTAL RECOMMENDED $51,632 $20,500 $2,169
111,958
kWh
$29,519
-
kW-mo/yr
$3,819
-
MMBtu
$13,768
-
Tgal
$243 $(-1,080.0) $1,000 $2,194
-
Tgal
TOTAL IMPLEMENTED $51,632 $20,500 $2,169
111,958
kWh
$29,519
-
kW-mo/yr
$3,819
-
MMBtu
$13,768
-
Tgal
$243 $(-1,080.0) $1,000 $2,194
-
Tgal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs