ITAC Assessment: IA0286
ITAC logo
ITAC Assessment: IA0286
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Corrugated containers
NAICS
n/a
SIC 2653: Corrugated and Solid Fiber Boxes
Sales Range $10
M
to 50
M
# of Employees 170
Plant Area 260,000
ft2
Annual Production 125,250,000
lb
Production Hrs. Annual 7,488
hrs
Location (State) Minnesota

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $174,903 5,814,000
kWh
Electricity Demand $97,072 12,900
kW-mo/yr
Natural Gas $285,522 49,833
MMBtu
Fuel Oil #2 $74,902 10,572
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $31,478 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $21,917

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,555 $434 $3,131
88,435
kWh
$1,424
-
kW-mo/yr
-
02 2.4221: Install compressor air intakes in coolest locations $1,616 $250 $1,128
31,872
kWh
$488
-
kW-mo/yr
-
03 2.4231: Reduce the pressure of compressed air to the minimum required $1,022 $25 $716
20,218
kWh
$306
-
kW-mo/yr
-
04 2.7135: Install occupancy sensors $1,353 $3,186 $1,353
38,227
kWh
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $8,465 $16,361 $5,630
159,039
kWh
$2,835
-
kW-mo/yr
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $2,320 - $1,625
45,903
kWh
$695
-
kW-mo/yr
-
07 2.7111: Reduce illumination to minimum necessary levels $2,270 $1,500 $1,590
44,928
kWh
$680
-
kW-mo/yr
-
08 2.1133: Adjust burners for efficient operation $2,691 $1,000 - - $2,691
-
MMBtu
09 2.1213: Direct warmest air to combustion intake $2,570 $3,500 - - $2,570
-
MMBtu
10 2.2437: Recover waste heat from equipment $6,028 $2,680 - - $6,028
-
MMBtu
11 4.445: Install equipment to move product $(-1,412.0) $80,000 $(-989.0)
(-27,930)
kWh
$(-423.0)
-
kW-mo/yr
-
TOTAL RECOMMENDED $31,478 $108,936 $14,184
400,692
kWh
$6,005
-
kW-mo/yr
$11,289
-
MMBtu
TOTAL IMPLEMENTED $21,917 $19,545 $13,104
370,177
kWh
$6,122
-
kW-mo/yr
$2,691
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs