ITAC Assessment: IA0285
ITAC logo
ITAC Assessment: IA0285
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Hydrants, valves, pumps
NAICS
n/a
SIC 3494: Valves and Pipe Fittings, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 370
Plant Area 140,000
ft2
Annual Production 211,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Minnesota

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $125,955 3,661,840
kWh
Electricity Demand $63,315 8,412
kW-mo/yr
Natural Gas $97,412 9,901
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $108,276 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $107,021

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,274 $458 $1,990
68,134
kWh
$1,284
-
kW-mo/yr
-
02 2.4221: Install compressor air intakes in coolest locations $806 $237 $489
16,745
kWh
$317
-
kW-mo/yr
-
03 2.4231: Reduce the pressure of compressed air to the minimum required $449 $92 $273
9,360
kWh
$176
-
kW-mo/yr
-
04 2.3131: Reschedule plant operations or reduce load to avoid peaks $39,507 $800 - $39,507
-
kW-mo/yr
-
05 3.5316: Contract a wood pallet recycling company $46,580 $320 - - $46,580
-
lb
06 3.7198: Reduce / eliminate use of disposable product $12,642 $3,424 - - $12,642
-
lb
07 3.6193: Install equipment (eg compactor) to reduce disposal costs $5,018 $7,500 - - $5,018
-
lb
TOTAL RECOMMENDED $108,276 $12,831 $2,752
94,239
kWh
$41,284
-
kW-mo/yr
$64,240
-
lb
TOTAL IMPLEMENTED $107,021 $12,502 $1,990
68,134
kWh
$40,791
-
kW-mo/yr
$64,240
-
lb
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs