ITAC Assessment: MA0006
ITAC logo
ITAC Assessment: MA0006
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1984
Principal Product ANODIZING OF METALS
NAICS
n/a
SIC 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring
Sales Range $1
M
to 5
M
# of Employees 35
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 5,160
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $48,355 599,941
kWh
Natural Gas $78,669 11,467
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $11,908 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,908

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $3,297 $400 - $3,297
-
MMBtu
02 2.2511: Insulate bare equipment $2,850 $1,872 - $2,850
-
MMBtu
03 2.2113: Repair or replace steam traps $4,985 $1,125 - $4,985
-
MMBtu
04 2.7111: Reduce illumination to minimum necessary levels $776 $125 $776
9,672
kWh
-
TOTAL RECOMMENDED $11,908 $3,522 $776
9,672
kWh
$11,132
-
MMBtu
TOTAL IMPLEMENTED $11,908 $3,522 $776
9,672
kWh
$11,132
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs