Assessment Year | 2001 |
---|---|
Principal Product | plastic consumer products for home use |
NAICS |
n/a
|
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $50 M to 100M |
# of Employees | 400 |
Plant Area |
675,000
ft2
|
Annual Production | 50,000,000
lb
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Iowa |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,006,166 | 39,676,000 |
kWh
|
$0.025 |
Electricity Demand | $381,241 | 75,780 |
kW-mo/yr
|
$5.03 |
Natural Gas | $191,710 | 25,774 |
MMBtu
|
$7.44 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $176,079 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4133: Use most efficient type of electric motors | $32,729 | - | n/a |
$23,901
940,992
kWh
|
$8,828
-
kW-mo/yr
|
- | - |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $10,244 | $407 | n/a |
$7,481
294,524
kWh
|
$2,763
-
kW-mo/yr
|
- | - |
03 | 2.4221: Install compressor air intakes in coolest locations | $1,906 | $222 | n/a |
$1,391
54,752
kWh
|
$515
-
kW-mo/yr
|
- | - |
04 | 2.7135: Install occupancy sensors | $8,703 | $19,781 | n/a |
$8,703
342,629
kWh
|
- | - | - |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,749 | $15,786 | n/a |
$5,180
203,952
kWh
|
$1,569
-
kW-mo/yr
|
- | - |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,228 | - | n/a |
$4,139
162,936
kWh
|
$1,089
-
kW-mo/yr
|
- | - |
07 | 2.7135: Install occupancy sensors | $2,150 | $1,463 | n/a |
$2,150
84,647
kWh
|
- | - | - |
08 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $6,055 | $12,857 | n/a |
$4,422
174,096
kWh
|
$1,633
-
kW-mo/yr
|
- | - |
09 | 4.441: Install automatic packing equipment | $98,343 | $250,000 | n/a | - | - | $98,343 | - |
10 | 4.444: Install system to collect scrap | $3,200 | $7,900 | n/a | - | - | $3,200 | - |
11 | 4.131: Modify process to reduce material use/cost | $772 | $1,940 | n/a | - | - | - | $772 |
TOTAL RECOMMENDED | $176,079 | $310,356 |
$57,367
2,258,528
kWh
|
$16,397
-
kW-mo/yr
|
$101,543 | $772 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs