| Assessment Year | 2001 |
|---|---|
| Principal Product | industrial hoses, rubber sheets |
| NAICS |
n/a
|
| SIC | 3069: Fabricated Rubber Products, Not Elsewhere Classified |
| Sales Range | $50 M to 100M |
| # of Employees | 400 |
| Plant Area |
230,000
ft2
|
| Annual Production | 20,000,000
lb
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | Nebraska |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $411,200 | 19,444,800 |
kWh
|
$0.021 |
| Electricity Demand | $276,846 | 34,308 |
kW-mo/yr
|
$8.07 |
| Natural Gas | $168,506 | 32,720 |
MMBtu
|
$5.15 |
| Fuel Oil #6 | $160,568 | 33,753 |
MMBtu
|
$4.76 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $276,496 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $15,195 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $10,148 | $36,193 |
$6,456
308,921
kWh
|
$3,692
-
kW-mo/yr
|
- | - | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,129 | - |
$756
36,164
kWh
|
$373
-
kW-mo/yr
|
- | - | |
| 03 | 2.7135: Install occupancy sensors | $2,257 | $3,259 |
$2,257
107,997
kWh
|
- | - | - | |
| 04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $8,705 | $761 |
$5,720
273,667
kWh
|
$2,985
-
kW-mo/yr
|
- | - | |
| 05 | 2.4221: Install compressor air intakes in coolest locations | $3,554 | $580 |
$2,329
111,441
kWh
|
$1,225
-
kW-mo/yr
|
- | - | |
| 06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,422 | $40 |
$934
44,676
kWh
|
$488
-
kW-mo/yr
|
- | - | |
| 07 | 2.4133: Use most efficient type of electric motors | $9,556 | - |
$5,984
286,331
kWh
|
$3,572
-
kW-mo/yr
|
- | - | |
| 08 | 2.1233: Analyze flue gas for proper air/fuel ratio | $3,004 | $5,000 | - | - |
$3,004
-
MMBtu
|
- | |
| 09 | 2.2135: Repair and eliminate steam leaks | $2,357 | $2,400 | - | - |
$2,357
-
MMBtu
|
- | |
| 10 | 4.445: Install equipment to move product | $234,364 | $136,500 | n/a | - | - | - | $234,364 |
| TOTAL RECOMMENDED | $276,496 | $184,733 |
$24,436
1,169,197
kWh
|
$12,335
-
kW-mo/yr
|
$5,361
-
MMBtu
|
$234,364 | ||
| TOTAL IMPLEMENTED | $15,195 | $8,161 |
$6,476
309,831
kWh
|
$3,358
-
kW-mo/yr
|
$5,361
-
MMBtu
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs