ITAC Assessment: IA0273
ITAC logo
ITAC Assessment: IA0273
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product corrugated medium
NAICS
n/a
SIC 2679: Converted Paper and Paperboard Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 130
Plant Area 130,680
ft2
Annual Production 80,800
ton
Production Hrs. Annual 8,736
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,260,280 53,185,680
kWh
Electricity Demand $12 45,096
kW-mo/yr
Natural Gas $3,975,002 1,008,900
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $134,220 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $107,653

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings
01 2.4133: Use most efficient type of electric motors $82,252 - $48,703
1,963,840
kWh
$33,549
-
kW-mo/yr
- -
02 2.1213: Direct warmest air to combustion intake $25,087 $2,000 - - $25,087
-
MMBtu
-
03 2.2113: Repair or replace steam traps $6,681 $1,205 - - $6,681
-
MMBtu
-
04 2.2135: Repair and eliminate steam leaks $2,752 $600 - - $2,752
-
MMBtu
-
05 2.4221: Install compressor air intakes in coolest locations $6,596 $414 $3,895
157,069
kWh
$2,701
-
kW-mo/yr
- -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,550 $190 $2,102
84,739
kWh
$1,448
-
kW-mo/yr
- -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $3,769 - $2,232
89,980
kWh
$1,537
-
kW-mo/yr
- -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $1,761 $2,230 $821
33,104
kWh
$940
-
kW-mo/yr
- -
09 2.6218: Turn off equipment when not in use $292 $900 $292
11,763
kWh
- - -
10 3.4115: Recover and reuse cooling water $1,480 $2,188 $(-93.0)
(-3,744)
kWh
$(-90.0)
-
kW-mo/yr
- $1,663
-
Tgal
TOTAL RECOMMENDED $134,220 $9,727 $57,952
2,336,751
kWh
$40,085
-
kW-mo/yr
$34,520
-
MMBtu
$1,663
-
Tgal
TOTAL IMPLEMENTED $107,653 $5,539 $58,045
2,340,495
kWh
$40,175
-
kW-mo/yr
$9,433
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs