ITAC Assessment: IA0306
ITAC logo
ITAC Assessment: IA0306
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Plastic containers
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 98
Plant Area 75,800
ft2
Annual Production 12,000,000
lb
Production Hrs. Annual 8,736
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $294,058 10,828,608
kWh
Electricity Demand $240,168 19,728
kW-mo/yr
Natural Gas $32,819 3,499
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $27,118 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,947

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,924 $537 $1,229
45,013
kWh
$695
-
kW-mo/yr
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,147 $2,412 $622
22,794
kWh
$525
-
kW-mo/yr
03 2.7135: Install occupancy sensors $346 $532 $346
12,677
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $2,726 - $1,741
63,773
kWh
$985
-
kW-mo/yr
05 2.4133: Use most efficient type of electric motors $6,150 - $3,601
131,914
kWh
$2,549
-
kW-mo/yr
06 2.2691: Shut off cooling if cold outside air will cool process $14,825 $28,000 $10,081
369,250
kWh
$4,744
-
kW-mo/yr
TOTAL RECOMMENDED $27,118 $31,481 $17,620
645,421
kWh
$9,498
-
kW-mo/yr
TOTAL IMPLEMENTED $11,947 $2,949 $7,193
263,494
kWh
$4,754
-
kW-mo/yr
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs