ITAC Assessment: IA0271
ITAC logo
ITAC Assessment: IA0271
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product plastic parts, storage tanks, and pillboxes
NAICS
n/a
SIC 3443: Fabricated Plate Work (Boiler Shops)
Sales Range $10
M
to 50
M
# of Employees 225
Plant Area 220,000
ft2
Annual Production 12,000,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $226,160 5,682,618
kWh
Electricity Demand $46,553 13,596
kW-mo/yr
Natural Gas $387,371 73,484
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $573,295 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $336,547

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $3,886 - $2,776
88,984
kWh
$1,110
-
kW-mo/yr
- - -
02 2.7135: Install occupancy sensors $789 $1,131 $789
25,283
kWh
- - - -
03 2.7229: Air condition only space necessary $1,333 $384 $1,021
32,710
kWh
$312
-
kW-mo/yr
- - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,698 $856 $5,296
169,734
kWh
$402
-
kW-mo/yr
- - -
05 2.4221: Install compressor air intakes in coolest locations $949 $165 $944
30,247
kWh
$5
-
kW-mo/yr
- - -
06 2.2437: Recover waste heat from equipment $251 $300 - - $251
-
MMBtu
- -
07 2.1123: Install automatic stack damper $6,759 $7,000 - - $6,759
-
MMBtu
- -
08 4.445: Install equipment to move product $256,000 $60,000 - - - - $256,000
09 4.445: Install equipment to move product $128,000 $90,960 - - - - $128,000
10 3.5212: Regrind, reuse, or sell scrap plastic parts $68,080 $16,000 - - - $68,080
-
lb
-
11 4.652: Replace existing equipment with more suitable substitutes $100,000 $100,000 - - - - $100,000
12 3.5315: Lease / purchase baler; sell cardboard to recycler $1,550 $3,400 - - - $1,550
-
lb
-
TOTAL RECOMMENDED $573,295 $280,196 $10,826
346,958
kWh
$1,829
-
kW-mo/yr
$7,010
-
MMBtu
$69,630
-
lb
$484,000
TOTAL IMPLEMENTED $336,547 $80,640 $9,093
291,428
kWh
$1,824
-
kW-mo/yr
- $69,630
-
lb
$256,000
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs