ITAC Assessment: SD0657
ITAC logo
ITAC Assessment: SD0657
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Paint/liquid coating
NAICS 325510: Paint and Coating Manufacturing
SIC 3479: Coating, Engraving, and Allied Services, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 110
Plant Area 66,000
ft2
Annual Production 100,000
units
Production Hrs. Annual 4,370
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $111,900 979,860
kWh
Electricity Demand $58,264 4,088
kW-mo/yr
TOTAL YEARLY COSTS $170,164
RECOMMENDED SAVINGS* $138,953 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $7,534 $5,677 $7,534
65,972
kWh
-
02 2.4231: Reduce the pressure of compressed air to the minimum required $7,484 $6,349 $7,484
65,532
kWh
-
03 2.9114: Use solar heat to make electricty $65,886 $151,862 $43,827
383,775
kWh
$22,059
-
kW-mo/yr
04 2.3141: Use battery storage for demand control $18,206 - $(-3,340.4)
(-29,250)
kWh
$21,546
-
kW-mo/yr
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,234 $2,880 $1,662
14,551
kWh
$572
-
kW-mo/yr
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $17,186 $10,841 $12,785
111,956
kWh
$4,401
-
kW-mo/yr
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $17,983 $13,634 $13,008
113,903
kWh
$4,975
-
kW-mo/yr
08 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,440 $3,627 $1,445
12,656
kWh
$995
-
kW-mo/yr
TOTAL RECOMMENDED $138,953 $194,870 $84,405
739,095
kWh
$54,548
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs