| Assessment Year | 2001 |
|---|---|
| Principal Product | packaging equipment |
| NAICS |
n/a
|
| SIC | 3565: Packaging Machinery |
| Sales Range | $10 M to 50M |
| # of Employees | 100 |
| Plant Area |
160,000
ft2
|
| Annual Production | 475
ton
|
| Production Hrs. Annual | 6,240
hrs
|
| Location (State) | Minnesota |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $46,036 | 1,597,320 |
kWh
|
$0.029 |
| Electricity Demand | $42,150 | 3,888 |
kW-mo/yr
|
$10.84 |
| Natural Gas | $16,249 | 3,673 |
MMBtu
|
$4.42 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $172,863 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $166,464 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,869 | $1,014 |
$2,825
98,090
kWh
|
$2,044
-
kW-mo/yr
|
- | |
| 02 | 2.4235: Remove or close off unneeded compressed air lines | $2,475 | - |
$1,034
35,893
kWh
|
$1,441
-
kW-mo/yr
|
- | |
| 03 | 2.4221: Install compressor air intakes in coolest locations | $648 | $125 |
$377
13,103
kWh
|
$271
-
kW-mo/yr
|
- | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,382 | - |
$1,961
68,016
kWh
|
$1,421
-
kW-mo/yr
|
- | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,744 | $4,539 |
$950
32,994
kWh
|
$794
-
kW-mo/yr
|
- | |
| 06 | 2.4133: Use most efficient type of electric motors | $625 | - |
$299
10,377
kWh
|
$326
-
kW-mo/yr
|
- | |
| 07 | 4.421: Modify current incentive program | $84,240 | - | - | - | $84,240 | |
| 08 | 4.421: Modify current incentive program | $74,880 | - | - | - | $74,880 | |
| TOTAL RECOMMENDED | $172,863 | $5,678 |
$7,446
258,473
kWh
|
$6,297
-
kW-mo/yr
|
$159,120 | ||
| TOTAL IMPLEMENTED | $166,464 | $1,014 |
$3,859
133,983
kWh
|
$3,485
-
kW-mo/yr
|
$159,120 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs