ITAC Assessment: IA0262
ITAC logo
ITAC Assessment: IA0262
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product fuel nozzles
NAICS
n/a
SIC 3511: Steam, Gas, and Hydraulic Turbines, and Turbine Generator Set Units
Sales Range $50
M
to 100
M
# of Employees 400
Plant Area 136,500
ft2
Annual Production 480,000
pieces
Production Hrs. Annual 6,084
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $166,636 4,826,202
kWh
Electricity Demand $69,274 12,084
kW-mo/yr
Natural Gas $12,245 8,442
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $7,366 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,358

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.2628: Utilize a less expensive cooling method $2,355 $10,000 $1,716
70,340
kWh
$639
-
kW-mo/yr
-
02 2.4133: Use most efficient type of electric motors $1,228 - $688
28,136
kWh
$540
-
kW-mo/yr
-
03 2.6218: Turn off equipment when not in use $1,048 - $287
11,723
kWh
$589
-
kW-mo/yr
$172
-
MMBtu
04 2.4221: Install compressor air intakes in coolest locations $875 $125 $439
17,878
kWh
$436
-
kW-mo/yr
-
05 2.4231: Reduce the pressure of compressed air to the minimum required $788 $221 $411
16,706
kWh
$377
-
kW-mo/yr
-
06 2.7444: Close holes and openings in building such as broken windows $522 $640 $121
4,982
kWh
$37
-
kW-mo/yr
$364
-
MMBtu
07 2.7135: Install occupancy sensors $550 $1,397 $550
22,567
kWh
- -
TOTAL RECOMMENDED $7,366 $12,383 $4,212
172,332
kWh
$2,618
-
kW-mo/yr
$536
-
MMBtu
TOTAL IMPLEMENTED $2,358 $861 $819
33,411
kWh
$1,003
-
kW-mo/yr
$536
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs