ITAC Assessment: IA0259
ITAC logo
ITAC Assessment: IA0259
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product electronic scoreboards
NAICS
n/a
SIC 3669: Communications Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 91
Plant Area 71,670
ft2
Annual Production 2,800
pieces
Production Hrs. Annual 2,210
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $33,815 706,624
kWh
Electricity Demand $14,118 2,400
kW-mo/yr
Natural Gas $16,118 3,300
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $200,241 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,460

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings Personnel Changes Savings Water Consumption Savings
01 2.7111: Reduce illumination to minimum necessary levels $5,066 $100 $3,019
64,185
kWh
$2,047
-
kW-mo/yr
- - - -
02 2.7135: Install occupancy sensors $530 $1,073 $530
11,137
kWh
- - - - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,277 $139 $759
16,120
kWh
$518
-
kW-mo/yr
- - - -
04 2.4221: Install compressor air intakes in coolest locations $248 $58 $147
3,224
kWh
$101
-
kW-mo/yr
- - - -
05 2.4231: Reduce the pressure of compressed air to the minimum required $120 $40 $73
1,465
kWh
$47
-
kW-mo/yr
- - - -
06 3.5145: Recover and reuse spent acid baths $58,747 $2,500 $(-388.0)
(-8,206)
kWh
$(-265.0)
-
kW-mo/yr
$59,400
-
gal
- - -
07 3.4157: Replace water cooling on processes with air cooling $1,445 $5,020 - - - - - $1,445
-
Tgal
08 3.5248: Separate and recycle scrap metal to foundry or for sale $208 $30 - - - $208
-
lb
- -
09 4.441: Install automatic packing equipment $132,600 $250,000 - - - - $132,600 -
TOTAL RECOMMENDED $200,241 $258,960 $4,140
87,925
kWh
$2,448
-
kW-mo/yr
$59,400
-
gal
$208
-
lb
$132,600 $1,445
-
Tgal
TOTAL IMPLEMENTED $3,460 $6,262 $1,289
27,257
kWh
$518
-
kW-mo/yr
- $208
-
lb
- $1,445
-
Tgal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings Personnel Changes Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs